Case study:Valtellina 2005 – New green system: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 13: | Line 13: | ||
46.142491667,9.5915611111 | 46.142491667,9.5915611111 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Italy | |||
|Main contact forename=Italo | |||
|Main contact surname=Buzzetti | |||
|Contact organisation=ERSAF – Unità Operativa di Morbegno (SO) | |||
|Name of parent multi-site project=Case_study:"Parco della Bosca" restoration | |||
|Multi-site=No | |||
|Monitoring surveys and results=3 years monitoring to reduce alloctone species recolonisation. | |||
|Country= | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Name of parent multi-site project= | |||
| | |||
| | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 190: | Line 171: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=reforestation, Reduction of bank slope, | ||
|Floodplain / River corridor=Excavation for floodplain creation,Requalification and improvement of forestal cover along corridor,Alloctone species control | |||
|Management interventions=Monitoring strategy, | |||
|Wider stakeholder / citizen engagement=Consultation | |||
|Floodplain / River corridor= | |||
|Management interventions= | |||
|Wider stakeholder / citizen engagement= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 217: | Line 186: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 225: | Line 192: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 08:19, 6 June 2017
This case study is pending approval by a RiverWiki administrator.
Location: 46° 8' 32.97" N, 9° 35' 29.62" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Italy |
Main contact forename | Italo |
Main contact surname | Buzzetti |
Main contact user ID | |
Contact organisation | ERSAF – Unità Operativa di Morbegno (SO) |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
Edit project overview to modify the Monitoring survey and results.
3 years monitoring to reduce alloctone species recolonisation.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|