Case study:Restoration of Enningdalsälv River: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 20: Line 15:
|Contact organisation url=www.enningdalselven.com
|Contact organisation url=www.enningdalselven.com
|Multi-site=Yes
|Multi-site=Yes
|Project picture=Langevallsalven after.jpg
|Picture description=Enningdalsälv River_after restoration (photo: Langevallsalven)
}}
{{Image gallery}}
{{Case study image
|File name=Copy of 1.jpg
|Caption=Enningdalsälv River_after restoration
}}
{{Case study image
|File name=SvingenE4 after restoration.jpg
|Caption=Enningdalsälv River_after restoration (photo: Svingen)
}}
{{Case study image
|File name=SvingenE3 before restoration.jpg
|Caption=Enningdalsälv River_bifore restoration (photo: Svingen)
}}
{{Case study image
|File name=Svingen before restoration.jpg
|Caption=Enningdalsälv River_before restoration (photo: Svingen)
}}
{{Case study image
|File name=Svingen after restoration.jpg
|Caption=Enningdalsälv River_after restoration (photo: Långevallsälven)
}}
{{Case study image
|File name=Langevallsalven  before 1.jpg
|Caption=Enningdalsälv River_before restoration (photo: Långevallsälven)
}}
}}
{{Case study image
|File name=Enningdalsalv River before.jpg
|Caption=Enningdalsälv River_during the restoration works (photo: )
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 77: Line 107:
        
        
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Project started=2009/06/01
   
|Works completed=2011/06/01
   
|Total cost category=100 - 500 k€
     
|Total1 cost=470 k€
|Project started=
|Funding sources=European Regional Development Fund,Västra Götalands län,NINA samt Direktoratet for naturforvaltning,Norska IR midler
      2009/06/01
|Works started=
     
|Works completed=
      2011/06/01
|Project completed=
     
|Total cost category=
      100 - 500 k€
|Total1 cost=
      470 k€
|Funding sources=
      European Regional Development Fund (ERDF),Västra Götalands län,NINA samt Direktoratet for naturforvaltning,Norska IR midler
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 164: Line 129:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Building of submerged weirs and pits,Re-introducing stones, Introduction of gravel, Creation of fish passes,
   
|Other technical measure=Liming
   
      Building fishways,Building of submerged weirs and pits,Introducing gravel,Re-introducing stones
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
      Liming
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 342: Line 293:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
{{Case study image
|File name=Copy of 1.jpg
|Caption=Enningdalsälv River_after restoration
}}
{{Case study image
|File name=SvingenE4 after restoration.jpg
|Caption=Enningdalsälv River after restoration (photo: Svingen E.)
}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 372: Line 313:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 12:36, 1 November 2018

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 58° 52' 58.97" N, 11° 32' 17.37" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://projektwebbar.lansstyrelsen.se/projektenningdalsalven/Sv/Pages/default.aspx
Themes Fisheries, Habitat and biodiversity, Hydromorphology
Country Sweden
Main contact forename Bäckstrand
Main contact surname Andreas
Main contact user ID
Contact organisation Tanums kommun & Enningdalsälvens vattenråd
Contact organisation web site http://www.enningdalselven.com
Partner organisations
This is a parent project
encompassing the following
projects
Enningdalsälv River_after restoration (photo: Langevallsalven)

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Enningdalsälv River_after restoration
Enningdalsälv River_after restoration (photo: Svingen)
Enningdalsälv River_bifore restoration (photo: Svingen)
Enningdalsälv River_before restoration (photo: Svingen)
Enningdalsälv River_after restoration (photo: Långevallsälven)
Enningdalsälv River_before restoration (photo: Långevallsälven)
Enningdalsälv River_during the restoration works (photo: )


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district
River basin Enningdal River Basin

Subcatchment

River name Enningdal River
Area category 100 - 1000 km²
Area (km2) 782 km²78,200 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover Woodland
Waterbody ID



Site

Name Catchment of River Enningdalsälven
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations multiple designations across the site
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2009/06/01
Works started
Works completed 2011/06/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 470 k€470,000 € <br />
Benefit to cost ratio
Funding sources European Regional Development Fund, Västra Götalands län, NINA samt Direktoratet for naturforvaltning, Norska IR midler

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Width & depth variation, Substrate conditions
Biology Fish: Abundance, Fish: Species composition, Invertebrates: Abundance
Physico-chemical pH, Acid neutralising capacity
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Building of submerged weirs and pits, Re-introducing stones, Introduction of gravel, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other Liming
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Width & depth variation Awaiting results
Substrate conditions Awaiting results

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Abundance Awaiting results
Fish: Species composition Awaiting results
Invertebrates: Abundance Awaiting results

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
pH
Acid neutralising capacity

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information