Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River: Difference between revisions
No edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 9: | Line 9: | ||
|Themes=Flood risk management, Hydromorphology | |Themes=Flood risk management, Hydromorphology | ||
|Country=Poland | |Country=Poland | ||
|Main contact forename= | |Main contact forename=Regionalny Zarząd Gospodarki Wodnej w Krakowie | ||
|Main contact surname= | |Main contact surname=Regionalny Zarząd Gospodarki Wodnej w Krakowie | ||
|Main contact id=Arolam | |||
|Contact organisation=Regional Water Management Board in Kraków | |Contact organisation=Regional Water Management Board in Kraków | ||
|Contact organisation url=www.krakow.rzgw.gov.pl/ | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The Czarny Dunajec River in the Vistula River basin in southern of Poland was restored as the aim of reducing the erosional threat to a nearby road. Initial plan was to reduce the flood risk in the reach through river channelization, rejected and replaced by the proposal to re-activate the flow in side channels and stimulate a natural cut-off of the main channel bend. The object was to increase number of low-flow channels and habitat variability in the reach and to open inlets to side channels and directing the flow to them by deflectors made of gravel. Work was done in summer 2011. | |||
After restoration storage of wood debris in the unmanaged, multi-thread river reach, increased and the risk of channel plugging by the debris in downstream, urbanised valley sections was reduced. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=NEnvironment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec Rivern landscape at Czarny Dunajec River .JPG | |||
|Caption=Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River landscape at Czarny Dunajec River | |||
}} | |||
{{Case study image | |||
|File name=NEnvironment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec Rivern Braided channel at Czarny...River.JPG | |||
|Caption=Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of_the_Czarny Dunajec Rivern Braided at Czarny River | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=The Vistula River basin | |Subcatchment=The Vistula River basin | ||
Line 40: | Line 58: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Opening inlets to side channels, | |Bank and bed modifications measure=Opening inlets to side channels, Creation of gravel deflectors | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 52: | Line 70: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 67: | Line 75: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 12:03, 31 May 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Hydromorphology |
Country | Poland |
Main contact forename | Regionalny Zarząd Gospodarki Wodnej w Krakowie |
Main contact surname | Regionalny Zarząd Gospodarki Wodnej w Krakowie |
Main contact user ID | User:Arolam |
Contact organisation | Regional Water Management Board in Kraków |
Contact organisation web site | http://www.krakow.rzgw.gov.pl/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Czarny Dunajec River in the Vistula River basin in southern of Poland was restored as the aim of reducing the erosional threat to a nearby road. Initial plan was to reduce the flood risk in the reach through river channelization, rejected and replaced by the proposal to re-activate the flow in side channels and stimulate a natural cut-off of the main channel bend. The object was to increase number of low-flow channels and habitat variability in the reach and to open inlets to side channels and directing the flow to them by deflectors made of gravel. Work was done in summer 2011.
After restoration storage of wood debris in the unmanaged, multi-thread river reach, increased and the risk of channel plugging by the debris in downstream, urbanised valley sections was reduced.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|