(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=63.4975648, 11.11120249999999 }} {{Project overview |Project title=Hofstadelva |Status=Complete |Themes=Envi...")
 
No edit summary
 
(9 intermediate revisions by the same user not shown)
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Hofstadelva
|Status=Complete
|Status=Complete
|Themes=Environmental flows and water resources, Flood risk management
|Themes=Environmental flows and water resources, Flood risk management
Line 15: Line 14:
|Contact organisation url=www.nve.no
|Contact organisation url=www.nve.no
|Multi-site=No
|Multi-site=No
|Project summary=Hofstadelva is a small side-river in a larger river system of Stjørdalselva. Due to risk of avalanche and erosion large sections of embarkments are established along both sides of Hofstadelva. Mitigation efforts included shaping of the embarkments to mimic the original stream structure, topsoil and turf transplants are used to improve natural vegetation recovery along the river.
|Monitoring surveys and results=A monitoring program for fish, benthos, plant life and birds during 2016 - 2018. Natural recovery is observed for all species groups. Grazing domestic animals cause some erosion that limit establishment of forest, and soil erosion into the river might be limiting for benthos.
|Lessons learn=Pre-project studies and cooperation have been important for the output. The involvemnt of experts in early phases of the projects have improved the positiv effects of mitigation. Mapping of species and ecosystem variables before the contruction is valuabel reference state for the monitoring after implementation.
|Project title=Hofstadelva
}}
}}
{{Image gallery}}
{{Image gallery}}
Line 21: Line 24:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site
{{Project background}}
|Name=Hofstadelva
{{Motivations}}
|WFD water body code=124-156-R
{{Measures}}
|Heavily modified water body=No
|Protected species present=Yes
|Invasive species present=Yes
|Species=some invasive species observed
|River corridor land use=Grazing, settlement
}}
{{Project background
|Reach length directly affected=1900
|Project started=2011
|Total1 cost=1100
|Funding sources=NVE
|Investigation and design Lead organisation=NVE
|Stakeholder engagement Lead organisation=NVE
|Works and supervision Lead organisation=NVE
|Post-project management and maintenance Lead organisation=NVE
}}
{{Motivations
|Specific mitigation=Mitigating river environment following embankments for erosion control
}}
{{Measures
|Bank and bed modifications measure=Bank stabilisation,
|Planform / Channel pattern=Channelling
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}
{{Biological quality elements header}}
{{Biological quality elements header}}
{{Biological quality element table row
|Element=Invertebrates: Abundance
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=Yes
|Control site used=No
|Result=Improvement
}}
{{Biological quality element table row
|Element=Fish: Abundance
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=Yes
|Control site used=No
|Result=Improvement
}}
{{Biological quality element table row
|Element=Fish: Age structure
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=Yes
|Control site used=No
|Result=Improvement
}}
{{End table}}
{{End table}}
{{Physico-chemical quality elements header}}
{{Physico-chemical quality elements header}}
{{End table}}
{{End table}}
{{Other responses header}}
{{Other responses header}}
{{Other response table row
|Element=Birds
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=Yes
|Control site used=No
|Result=Inconclusive
}}
{{Other response table row
|Element=river bank vegetation
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=Yes
|Control site used=No
|Result=Improvement
}}
{{End table}}
{{End table}}
{{Monitoring documents}}
{{Monitoring documents}}
Line 38: Line 108:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=https://brage.nina.no/nina-xmlui/bitstream/handle/11250/2433005/1320.pdf?sequence=4&isAllowed=y
|Description=Monitoring report Hofstadelva 2016
}}
{{Additional links and references
|Link=https://www.ntnu.no/c/document_library/get_file?uuid=0ede4612-85c7-4b0e-85f7-08d7ecbd5a39&groupId=10476
|Description=Report before embarkment Hofstadelva 2011
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 13:49, 11 February 2020

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 63° 29' 51.23" N, 11° 6' 40.33" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Flood risk management
Country Norway
Main contact forename Mads
Main contact surname Johnsen
Main contact user ID
Contact organisation The Norwegian Water Resources and Energy Directorate (NVE)
Contact organisation web site http://www.nve.no
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Hofstadelva is a small side-river in a larger river system of Stjørdalselva. Due to risk of avalanche and erosion large sections of embarkments are established along both sides of Hofstadelva. Mitigation efforts included shaping of the embarkments to mimic the original stream structure, topsoil and turf transplants are used to improve natural vegetation recovery along the river.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


A monitoring program for fish, benthos, plant life and birds during 2016 - 2018. Natural recovery is observed for all species groups. Grazing domestic animals cause some erosion that limit establishment of forest, and soil erosion into the river might be limiting for benthos.

Lessons learnt

Edit project overview to modify the lessons learnt.


Pre-project studies and cooperation have been important for the output. The involvemnt of experts in early phases of the projects have improved the positiv effects of mitigation. Mapping of species and ecosystem variables before the contruction is valuabel reference state for the monitoring after implementation.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Hofstadelva
WFD water body codes 124-156-R
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest some invasive species observed
Dominant hydrology
Dominant substrate
River corridor land use Grazing, settlement
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 19001,900 m <br />1.9 km <br />190,000 cm <br />
Project started 2011
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 11001,100 k€ <br />1,100,000 € <br />
Benefit to cost ratio
Funding sources NVE

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design NVE
Stakeholder engagement and communication NVE
Works and works supervision NVE
Post-project management and maintenance NVE
Monitoring



Reasons for river restoration

Mitigation of a pressure Mitigating river environment following embankments for erosion control
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Bank stabilisation
Floodplain / River corridor
Planform / Channel pattern Channelling
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates: Abundance Yes Yes No Yes No Improvement
Fish: Abundance Yes Yes No Yes No Improvement
Fish: Age structure Yes Yes No Yes No Improvement

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Birds Yes Yes No Yes No Inconclusive
river bank vegetation Yes Yes No Yes No Improvement


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://https://brage.nina.no/nina-xmlui/bitstream/handle/11250/2433005/1320.pdf?sequence=4&isAllowed=y Monitoring report Hofstadelva 2016