Case study:Habitat improvement measures in Bortneelva: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(36 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 8: Line 8:
|Status=Complete
|Status=Complete
|Project web site url=www.vannportalen.no/vannregioner/sogn--og-fjordane/vassomrade/nordfjord/nyhende-nordfjord/2017/miljotiltak-i-bortneelva/
|Project web site url=www.vannportalen.no/vannregioner/sogn--og-fjordane/vassomrade/nordfjord/nyhende-nordfjord/2017/miljotiltak-i-bortneelva/
|Themes=Habitat and biodiversity, Hydropower, Hydromorphology
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydropower, Hydromorphology, Monitoring
|Country=Norway
|Country=Norway
|Main contact forename=Vegard
|Main contact forename=Vegard
Line 14: Line 14:
|Contact organisation=SFE Produksjon AS
|Contact organisation=SFE Produksjon AS
|Contact organisation url=sfe.no/konsern
|Contact organisation url=sfe.no/konsern
|Partner organisations=Svelgen Kraft AS, The Norwegian Public Roads Administration, County Governor of Vestland, Sub-district Nordfjord /Bremanger municipality, Uni Research Miljø LFI, Rådgivende Biologer AS
|Partner organisations=Svelgen Kraft AS, The Norwegian Public Roads Administration, County Governor of Vestland, Sub-district (Vannområde) Nordfjord /Bremanger municipality, Uni Research Miljø LFI, Rådgivende Biologer AS
|Multi-site=No
|Multi-site=No
|Project summary=Svelgen Kraft (SK) utilize about 7% of the water that flows naturally in the Bortne-river for power production at the Svelgen I power plant. The established measures in the river will mitigate the impacts from this production and enhances the growing and living conditions for anadromous fish in the river.
|Project picture=Bortneelva.png
|Project summary=Svelgen Kraft (SK) use about 7% of the water that flows naturally in the Bortne-river for power production at the Svelgen I power plant. The measures carried out in the river were planned to mitigate the impacts of the power production and to enhance the growing and living conditions of anadromous fish in the river.


At the request of landowners and a dialogue with the County Governor's environmental protection department, SK took the initiative to map the river. In the light of ongoing processes such as the EU's water framework directive and renewal of the concessions for the Svelgen I and II power plants, as well as SK's goal of operating environmentally sound water management, mapping and measures were prioritized. The survey was carried out by Uni Research Miljø LFI in 2016. Habitat conditions in the river was depicted and possible measures were suggested to improve the fish's growing and living conditions.
Mapping and improvement works were prioritized. This was driven by many factors and stakeholders, including landowners, the County Governor's environmental protection department, the EU's water framework directive and SK themselves. The renewal of the concessions for the Svelgen I and II power plants were in review and SK's goal is to practice environmentally sound water management. The survey was carried out by Uni Research Miljø LFI in 2016. Habitat conditions in the river were described and possible measures were suggested to improve the fish's growing and living conditions.


After clarification with landowners, other operators in the river and authorities, the physical work was carried out in autumn/winter 2016-17 by Machine3prenør1. Different types of measures have been established in an approximated 2 km long stretch of the river.  
After clarification with landowners, other operators in the river and the relevant authorities, the physical work was carried out in autumn/winter 2016-17 by Machine3prenør1. Different types of measures were carried out over an approximately 2 km long stretch of river.  
These following measures was done:
 
• Removal of migration barriers by building a “fish passage” with two ponds.  
The following measures were done:
• Construction of flow deflectors to concentrate the stream of water in the river, which gives the fish easier migration paths in the case of low water levels.  
 
• Laying of stone blocks and boulders in clusters to improve the fish's ability to hide.  
• Removal of migration barriers by building a “fish passage” with two ponds.
• Construction of flow deflectors to concentrate the stream of water in the river, which gives the fish easier migration paths in the case of low water levels.
• Laying of stone blocks and boulders in clusters to improve the fish's ability to hide.
• Digging of ditches and opening of a natural "fish tunnels" to drain water to migration paths at low water levels.
• Digging of ditches and opening of a natural "fish tunnels" to drain water to migration paths at low water levels.
|Monitoring surveys and results=https://www.radgivende-biologer.no/wp-content/uploads/2019/10/2910.pdf
https://docplayer.me/50826638-Habitatkartlegging-i-bortneelva-bremanger-kommune.html
|Lessons learn=Results so far:
Fish studies were conducted in 2018 by Rådgivende Biologer AS. Due to general low densities of juvenile fish in 2018, there were not enough data to say anything conclusive about the effects of the measures conducted in the river (Irgens, C. & Hellen, B.A.  2019. Fiskebiologiske undersøkelser i Bortneelva i 2018. Rådgivende Biologer AS, rapport 2910, 16 sider, ISBN 978-82-8308-63 3-1).
|Project title=Habitat improvement measures in Bortneelva
|Project title=Habitat improvement measures in Bortneelva
}}
}}
Line 33: Line 45:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site
{{Project background}}
|Name=Bortneelva
{{Motivations}}
|WFD water body code=086-141-R and 086-139-R
{{Measures}}
|WFD (national) typology=RWH1211
|WFD water body name=Bortneelva og Bortneelva, nedre del
|Heavily modified water body=No
|Protected species present=Yes
|Invasive species present=No
|Species=Salmon and Sea-trout
|Dominant hydrology=Artificially regulated,
|Dominant substrate=Cobble,
|River corridor land use=Grassland, Woodland,
|Mn discharge=2.1
}}
{{Project background
|Reach length directly affected=2000
|Project started=2014/01/01
|Project completed=2017/01/01
|Funding sources=Svelgen Kraft AS, The Norwegian Public Roads Administration and Sub-district Nordfjord /Bremanger municipality
}}
{{Motivations
|Specific mitigation=Hydropower, Barriers to fish migration,
|Biological quality elements=Fish,
}}
{{Measures
|Bank and bed modifications measure=Deflectors, Creation of fish passes, Removal of fish barriers, Creation of pools, Creation of fish refuge areas, introduction of blocks, Big rocks are placed in the stream, Creation of low flow channel,
|Floodplain / River corridor=Improving fish migration,
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}
{{Biological quality elements header}}
{{Biological quality elements header}}
{{Biological quality element table row
|Element=Fish
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=No
|Control site used=No
|Result=Inconclusive
}}
{{End table}}
{{End table}}
{{Physico-chemical quality elements header}}
{{Physico-chemical quality elements header}}
Line 50: Line 95:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=docplayer.me/50826638-Habitatkartlegging-i-bortneelva-bremanger-kommune.html
|Description=Plan of measures
}}
{{Additional links and references
|Link=www.radgivende-biologer.no/wp-content/uploads/2019/10/2910.pdf
|Description=Report
}}
{{Additional links and references
|Link=www.vannportalen.no/vannregioner/sogn--og-fjordane/vassomrade/nordfjord/nyhende-nordfjord/2017/miljotiltak-i-bortneelva/
|Description=Website Vannportalen
}}
{{Additional links and references
|Link=lakseelver.no/nb/news-2018/overvakning-i-bortneelva-og-eidselva
|Description=Website on research in river Eidselva
}}
{{Additional links and references
|Link=www.firdaposten.no/bremanger/svelgen/fiskeoppdrett/inviterer-villfisken-tilbake-til-elva/f/5-16-148302
|Description=News article
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 09:15, 25 February 2020

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 61° 50' 49.44" N, 5° 23' 38.04" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.vannportalen.no/vannregioner/sogn--og-fjordane/vassomrade/nordfjord/nyhende-nordfjord/2017/miljotiltak-i-bortneelva/
Themes Environmental flows and water resources, Habitat and biodiversity, Hydropower, Hydromorphology, Monitoring
Country Norway
Main contact forename Vegard
Main contact surname Fagerli
Main contact user ID
Contact organisation SFE Produksjon AS
Contact organisation web site http://sfe.no/konsern
Partner organisations Svelgen Kraft AS, The Norwegian Public Roads Administration, County Governor of Vestland, Sub-district (Vannområde) Nordfjord /Bremanger municipality, Uni Research Miljø LFI, Rådgivende Biologer AS
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Svelgen Kraft (SK) use about 7% of the water that flows naturally in the Bortne-river for power production at the Svelgen I power plant. The measures carried out in the river were planned to mitigate the impacts of the power production and to enhance the growing and living conditions of anadromous fish in the river.

Mapping and improvement works were prioritized. This was driven by many factors and stakeholders, including landowners, the County Governor's environmental protection department, the EU's water framework directive and SK themselves. The renewal of the concessions for the Svelgen I and II power plants were in review and SK's goal is to practice environmentally sound water management. The survey was carried out by Uni Research Miljø LFI in 2016. Habitat conditions in the river were described and possible measures were suggested to improve the fish's growing and living conditions.

After clarification with landowners, other operators in the river and the relevant authorities, the physical work was carried out in autumn/winter 2016-17 by Machine3prenør1. Different types of measures were carried out over an approximately 2 km long stretch of river.

The following measures were done:

• Removal of migration barriers by building a “fish passage” with two ponds.

• Construction of flow deflectors to concentrate the stream of water in the river, which gives the fish easier migration paths in the case of low water levels.

• Laying of stone blocks and boulders in clusters to improve the fish's ability to hide.

• Digging of ditches and opening of a natural "fish tunnels" to drain water to migration paths at low water levels.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


https://www.radgivende-biologer.no/wp-content/uploads/2019/10/2910.pdf

https://docplayer.me/50826638-Habitatkartlegging-i-bortneelva-bremanger-kommune.html

Lessons learnt

Edit project overview to modify the lessons learnt.


Results so far:

Fish studies were conducted in 2018 by Rådgivende Biologer AS. Due to general low densities of juvenile fish in 2018, there were not enough data to say anything conclusive about the effects of the measures conducted in the river (Irgens, C. & Hellen, B.A. 2019. Fiskebiologiske undersøkelser i Bortneelva i 2018. Rådgivende Biologer AS, rapport 2910, 16 sider, ISBN 978-82-8308-63 3-1).


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Bortneelva
WFD water body codes 086-141-R and 086-139-R
WFD (national) typology RWH1211
WFD water body name Bortneelva og Bortneelva, nedre del
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present No
Species of interest Salmon and Sea-trout
Dominant hydrology Artificially regulated
Dominant substrate Cobble
River corridor land use Grassland, Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 2.12.1 m³/s <br />2,100 l/s <br />
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 20002,000 m <br />2 km <br />200,000 cm <br />
Project started 2014/01/01
Works started
Works completed
Project completed 2017/01/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Svelgen Kraft AS, The Norwegian Public Roads Administration and Sub-district Nordfjord /Bremanger municipality

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Hydropower, Barriers to fish migration
Hydromorphology
Biology Fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Deflectors, Creation of fish passes, Removal of fish barriers, Creation of pools, Creation of fish refuge areas, introduction of blocks, Big rocks are placed in the stream, Creation of low flow channel
Floodplain / River corridor Improving fish migration
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish Yes Yes No No No Inconclusive

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://docplayer.me/50826638-Habitatkartlegging-i-bortneelva-bremanger-kommune.html Plan of measures
http://www.radgivende-biologer.no/wp-content/uploads/2019/10/2910.pdf Report
http://www.vannportalen.no/vannregioner/sogn--og-fjordane/vassomrade/nordfjord/nyhende-nordfjord/2017/miljotiltak-i-bortneelva/ Website Vannportalen
http://lakseelver.no/nb/news-2018/overvakning-i-bortneelva-og-eidselva Website on research in river Eidselva
http://www.firdaposten.no/bremanger/svelgen/fiskeoppdrett/inviterer-villfisken-tilbake-til-elva/f/5-16-148302 News article