Case study:Gilev's Grove reconstruction: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(7 intermediate revisions by the same user not shown)
Line 67: Line 67:
|File name=2-z60-5c3e3209-5621-4350-b4d4-51865370f763.jpg
|File name=2-z60-5c3e3209-5621-4350-b4d4-51865370f763.jpg
|Caption=Watching pavilion
|Caption=Watching pavilion
}}
{{Case study image
|File name=2-z10-4e892d1d-342a-4dde-9218-514f865b5130.jpg
|Caption=Barbeque place
}}
{{Case study image
|File name=2-z25-c2997df3-e384-4396-81fd-b4e6b76b7bf6.jpg
|Caption=Scandinavian walking
}}
{{Case study image
|File name=2-z27-4897ecab-2fac-41a6-88a7-e60a7da8dc21.jpg
|Caption=New bridge over the brook
}}
{{Case study image
|File name=2-z29-e0d7e92f-74c5-45cd-ad21-e8c82f8b019c.jpg
|Caption=Online security cameras
}}
{{Case study image
|File name=2-z56-25b56405-1509-4c83-b4a6-a352aa06e6bd.jpg
|Caption=The Klyuchi stream restoration
}}
}}
{{Image gallery end}}
{{Image gallery end}}
Line 72: Line 92:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site
{{Project background}}
|Name=the Gilev's Grove
{{Motivations}}
|WFD water body name=Klyuchi stream
{{Measures}}
|Pre-project morphology=fluvial
|Reference morphology=fluvial
|Desired post project morphology=fluvial
|Heavily modified water body=No
|Local site designation=local recreation place
|Protected species present=No
|Invasive species present=No
|Dominant hydrology=brook, small stream
|Dominant substrate=Sand, Clay,
|River corridor land use=parklands fofrest
|Average bankfull channel width category=2 - 5 m
|Average bankfull channel depth category=Less than 0.5 m
|Mean discharge category=Less than 0.1 m³/s
|Average channel gradient category=0.001 - 0.01
}}
{{Project background
|Reach length directly affected=500
|Project started=2014/12/01
|Works started=2015/02/01
|Works completed=2017/10/31
|Project completed=2017/12/31
|Total cost category=5000 - 10000 k€
|Total1 cost=6600
|Funding sources=Municipality of Tyumen
|Investigation and design cost category=500 - 1000 k€
|Investigation and design Lead organisation=Mostostroy-11
|Investigation and design Other contact forename=Nikolay
|Investigation and design Other contact surname=Russu
|Works1 and supervision cost category=1000 - 5000 k€
|Wrk and supervision cost=5600
|Works and supervision Lead organisation=Mostostroy-11
|Works and supervision Other contact forename=Nikolay
|Works and supervision Other contact surname=Russu
|Post-project1 management and maintenance cost category=100 - 500 k€
|Post-project2 management and maintenance cost=250
|Post-project management and maintenance Lead organisation=Ecology Department of Tyumen City
|Post-project management and maintenance Other contact forename=Semen
|Post-project management and maintenance Other contact surname=Tegentzev
}}
{{Motivations
|Specific mitigation=lack of public nature parks, water pollution
|Other motivation=complete reconstruction of a local park, revitalisation of surrounding environment
}}
{{Measures
|Bank and bed modifications measure=banks strengthening with geotextile and villow plantening
|Floodplain / River corridor=gabions constructions close to the bridge
|Planform / Channel pattern=Meandering channel
|Other technical measure=two new bridges were constructed over a brook
|Social measures=sport facilities, educational path along the stream, barbeque places, rent of sporting stuff and accessuaries
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}
Line 89: Line 158:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=https://72.ru/text/gorod/294961606352896.html
|Description=10 highlights of the Gilev's Grove
}}
{{Additional links and references
|Link=http://park72.ru/city/72280/
|Description=brook Klyuchi before restoration
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 11:10, 12 March 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 57° 7' 29.19" N, 65° 38' 3.20" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://https://72.ru/text/gorod/294961606352896.html
Themes Habitat and biodiversity, Hydromorphology, Social benefits, Spatial planning, Water quality
Country Russia
Main contact forename Timur
Main contact surname Pavluk
Main contact user ID User:T.Pavluk
Contact organisation RosNIIVH
Contact organisation web site http://wrm.ru
Partner organisations
This is a parent project
encompassing the following
projects
General scheme of the Gilev's Grove

Project summary

Edit project overview to modify the project summary.


Reconstruction of a unique forest park, which is located between two water objects - the Klyuchi stream and Lake Krivoe - began in 2015 and ended in November of 2016. Objectives to be achieved: 1) Protection and restoration of the Klyuchi stream valley. The workers stabilized about 23 thousand square meters of slopes and re-designed the bed of the Klyuchi stream. New bridge-passage was built over the stream in the grove. After restoration works completion the unpleasant smell from the Klyuchi stream in the forest park was not traced anymore. 2) Allocation of entertainment facilities: large picnic mangal-barbeque zone. 19 arbors were installed along the stream. Swings were mounted for kids between arbors. Sanitation facilities were put nearby as well. 3) Installation of new playgrounds for children. They are designed for children of different ages and different interests. There are sandboxes and swings for toddlers and various sports equipment for tinagers. Comfortable benches installed carefully for parents throughout the gaming area. 4) Gilev's Grove had been and remains a great place for sports. In winter time there is a hockey box and illuminated ski track. In warm season active leisure lovers will enjoy a pleasant cycle path and six playgrounds for sports. People with pleasure ride on rollers, scooters, skateboards, bicycles and even roller skis, run and do Scandinavian walking. 5) For nature lovers the birds watch zone is equipped on the shore of Lake Krivoe. This part of the Grove is rarely crowded. Only birds singing violates silence of the beautiful view of the lake here. 6) Grove is a great place for photo shoots. Especially for the newlyweds, who often come here to capture the happy moments of their lives, an admiring white open-air pavilion not far from the central entrance was installed. 7) After reconstruction, figures of various animals appeared in the Gilev's Grove. The sculptures are very popular among children. 8) Park territory became as comfortable, as safe. On the territory 427 lanterns and more than 200 surveillance cameras were installed. Throughout the entire walking routes, new benches and litter bins were allocated. 9) Tyumen residents who came to the Grove by car, no longer need to worry about parking. New parking place was arranged for 468 cars.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Klyuchi stream rehabilitation
rehabilitation technical works -2
rehabilitation technical works -3
stream banks strengthening
stream bed cleaning
Children playground
Wild animals sculptures
White admiring open-air pavilion
Watching pavilion
Barbeque place
Scandinavian walking
New bridge over the brook
Online security cameras
The Klyuchi stream restoration
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name the Gilev's Grove
WFD water body codes
WFD (national) typology
WFD water body name Klyuchi stream
Pre-project morphology fluvial
Reference morphology fluvial
Desired post project morphology fluvial
Heavily modified water body No
National/international site designation
Local/regional site designations local recreation place
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology brook, small stream
Dominant substrate Sand, Clay
River corridor land use parklands fofrest
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m)
Average bankfull channel depth category Less than 0.5 m
Average bankfull channel depth (m)
Mean discharge category Less than 0.1 m³/s
Mean annual discharge (m3/s)
Average channel gradient category 0.001 - 0.01
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 500500 m <br />0.5 km <br />50,000 cm <br />
Project started 2014/12/01
Works started 2015/02/01
Works completed 2017/10/31
Project completed 2017/12/31
Total cost category 5000 - 10000 k€
Total cost (k€) 66006,600 k€ <br />6,600,000 € <br />
Benefit to cost ratio
Funding sources Municipality of Tyumen

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 500 - 1000 k€ Mostostroy-11 Nikolay Russu
Stakeholder engagement and communication
Works and works supervision 1000 - 5000 k€ 56005,600 k€ <br />5,600,000 € <br /> Mostostroy-11 Nikolay Russu
Post-project management and maintenance 100 - 500 k€ 250250 k€ <br />250,000 € <br /> Ecology Department of Tyumen City Semen Tegentzev
Monitoring



Reasons for river restoration

Mitigation of a pressure lack of public nature parks, water pollution
Hydromorphology
Biology
Physico-chemical
Other reasons for the project complete reconstruction of a local park, revitalisation of surrounding environment


Measures

Structural measures
Bank/bed modifications banks strengthening with geotextile and villow plantening
Floodplain / River corridor gabions constructions close to the bridge
Planform / Channel pattern Meandering channel
Other two new bridges were constructed over a brook
Non-structural measures
Management interventions
Social measures (incl. engagement) sport facilities, educational path along the stream, barbeque places, rent of sporting stuff and accessuaries
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://https://72.ru/text/gorod/294961606352896.html 10 highlights of the Gilev's Grove
http://http://park72.ru/city/72280/ brook Klyuchi before restoration

Supplementary Information

Edit Supplementary Information