Case study:Gilev's Grove reconstruction: Difference between revisions
No edit summary |
No edit summary |
||
(11 intermediate revisions by the same user not shown) | |||
Line 19: | Line 19: | ||
|Picture description=General scheme of the Gilev's Grove | |Picture description=General scheme of the Gilev's Grove | ||
|Project summary=Reconstruction of a unique forest park, which is located between two water objects - the Klyuchi stream and Lake Krivoe - began in 2015 and ended in November of 2016. | |Project summary=Reconstruction of a unique forest park, which is located between two water objects - the Klyuchi stream and Lake Krivoe - began in 2015 and ended in November of 2016. | ||
Objectives to be | Objectives to be achieved: | ||
1) Protection and restoration of the Klyuchi stream valley. The workers stabilized about 23 thousand square meters of slopes and re-designed the bed of the Klyuchi stream. New bridge-passage was built over the stream in the grove. After restoration works completion the unpleasant smell from the Klyuchi stream in the forest park was not traced anymore. | 1) Protection and restoration of the Klyuchi stream valley. The workers stabilized about 23 thousand square meters of slopes and re-designed the bed of the Klyuchi stream. New bridge-passage was built over the stream in the grove. After restoration works completion the unpleasant smell from the Klyuchi stream in the forest park was not traced anymore. | ||
2) Allocation of entertainment facilities: large picnic mangal-barbeque zone. 19 arbors were installed along the stream. Swings were mounted for kids between arbors. Sanitation facilities were put nearby as well. | 2) Allocation of entertainment facilities: large picnic mangal-barbeque zone. 19 arbors were installed along the stream. Swings were mounted for kids between arbors. Sanitation facilities were put nearby as well. | ||
3)Installation of new playgrounds for children. They are designed for children of different ages and different interests. There are sandboxes and swings for toddlers and various sports equipment for tinagers. Comfortable benches installed carefully for parents throughout the gaming area. | 3) Installation of new playgrounds for children. They are designed for children of different ages and different interests. There are sandboxes and swings for toddlers and various sports equipment for tinagers. Comfortable benches installed carefully for parents throughout the gaming area. | ||
4) | 4) Gilev's Grove had been and remains a great place for sports. In winter time there is a hockey box and illuminated ski track. In warm season active leisure lovers will enjoy a pleasant cycle path and six playgrounds for sports. People with pleasure ride on rollers, scooters, skateboards, bicycles and even roller skis, run and do Scandinavian walking. | ||
5) For nature lovers the birds watch zone is equipped on the shore of Lake Krivoe. This part of the Grove is rarely crowded. Only birds singing violates silence of the beautiful view of the lake here. | |||
6) Grove is a great place for photo shoots. Especially for the newlyweds, who often come here to capture the happy moments of their lives, an admiring white open-air pavilion not far from the central entrance was installed. | |||
7) After reconstruction, figures of various animals appeared in the Gilev's Grove. The sculptures are very popular among children. | |||
8) Park territory became as comfortable, as safe. On the territory 427 lanterns and more than 200 surveillance cameras were installed. Throughout the entire walking routes, new benches and litter bins were allocated. | |||
9) Tyumen residents who came to the Grove by car, no longer need to worry about parking. New parking place was arranged for 468 cars. | |||
|Project title=Gilev's Grove reconstruction | |Project title=Gilev's Grove reconstruction | ||
}} | }} | ||
Line 38: | Line 43: | ||
|File name=3887.jpg | |File name=3887.jpg | ||
|Caption=rehabilitation technical works -3 | |Caption=rehabilitation technical works -3 | ||
}} | |||
{{Case study image | |||
|File name=38378.jpg | |||
|Caption=stream banks strengthening | |||
}} | |||
{{Case study image | |||
|File name=Untitled.png | |||
|Caption=stream bed cleaning | |||
}} | |||
{{Case study image | |||
|File name=2-z1-05ffa9bf-efc6-4835-bfb3-16168772bcb7.jpg | |||
|Caption=Children playground | |||
}} | |||
{{Case study image | |||
|File name=2-z1-9b0c4c55-b4e9-42b0-aa78-ee64b34882bd.jpg | |||
|Caption=Wild animals sculptures | |||
}} | |||
{{Case study image | |||
|File name=2-z17-b87d71d9-8950-4ef4-8028-a47c8626132d.jpg | |||
|Caption=White admiring open-air pavilion | |||
}} | |||
{{Case study image | |||
|File name=2-z60-5c3e3209-5621-4350-b4d4-51865370f763.jpg | |||
|Caption=Watching pavilion | |||
}} | |||
{{Case study image | |||
|File name=2-z10-4e892d1d-342a-4dde-9218-514f865b5130.jpg | |||
|Caption=Barbeque place | |||
}} | |||
{{Case study image | |||
|File name=2-z25-c2997df3-e384-4396-81fd-b4e6b76b7bf6.jpg | |||
|Caption=Scandinavian walking | |||
}} | |||
{{Case study image | |||
|File name=2-z27-4897ecab-2fac-41a6-88a7-e60a7da8dc21.jpg | |||
|Caption=New bridge over the brook | |||
}} | |||
{{Case study image | |||
|File name=2-z29-e0d7e92f-74c5-45cd-ad21-e8c82f8b019c.jpg | |||
|Caption=Online security cameras | |||
}} | |||
{{Case study image | |||
|File name=2-z56-25b56405-1509-4c83-b4a6-a352aa06e6bd.jpg | |||
|Caption=The Klyuchi stream restoration | |||
}} | }} | ||
{{Image gallery end}} | {{Image gallery end}} | ||
Line 43: | Line 92: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Name=the Gilev's Grove | ||
{{Motivations}} | |WFD water body name=Klyuchi stream | ||
{{Measures}} | |Pre-project morphology=fluvial | ||
|Reference morphology=fluvial | |||
|Desired post project morphology=fluvial | |||
|Heavily modified water body=No | |||
|Local site designation=local recreation place | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Dominant hydrology=brook, small stream | |||
|Dominant substrate=Sand, Clay, | |||
|River corridor land use=parklands fofrest | |||
|Average bankfull channel width category=2 - 5 m | |||
|Average bankfull channel depth category=Less than 0.5 m | |||
|Mean discharge category=Less than 0.1 m³/s | |||
|Average channel gradient category=0.001 - 0.01 | |||
}} | |||
{{Project background | |||
|Reach length directly affected=500 | |||
|Project started=2014/12/01 | |||
|Works started=2015/02/01 | |||
|Works completed=2017/10/31 | |||
|Project completed=2017/12/31 | |||
|Total cost category=5000 - 10000 k€ | |||
|Total1 cost=6600 | |||
|Funding sources=Municipality of Tyumen | |||
|Investigation and design cost category=500 - 1000 k€ | |||
|Investigation and design Lead organisation=Mostostroy-11 | |||
|Investigation and design Other contact forename=Nikolay | |||
|Investigation and design Other contact surname=Russu | |||
|Works1 and supervision cost category=1000 - 5000 k€ | |||
|Wrk and supervision cost=5600 | |||
|Works and supervision Lead organisation=Mostostroy-11 | |||
|Works and supervision Other contact forename=Nikolay | |||
|Works and supervision Other contact surname=Russu | |||
|Post-project1 management and maintenance cost category=100 - 500 k€ | |||
|Post-project2 management and maintenance cost=250 | |||
|Post-project management and maintenance Lead organisation=Ecology Department of Tyumen City | |||
|Post-project management and maintenance Other contact forename=Semen | |||
|Post-project management and maintenance Other contact surname=Tegentzev | |||
}} | |||
{{Motivations | |||
|Specific mitigation=lack of public nature parks, water pollution | |||
|Other motivation=complete reconstruction of a local park, revitalisation of surrounding environment | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=banks strengthening with geotextile and villow plantening | |||
|Floodplain / River corridor=gabions constructions close to the bridge | |||
|Planform / Channel pattern=Meandering channel | |||
|Other technical measure=two new bridges were constructed over a brook | |||
|Social measures=sport facilities, educational path along the stream, barbeque places, rent of sporting stuff and accessuaries | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 60: | Line 158: | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=https://72.ru/text/gorod/294961606352896.html | |||
|Description=10 highlights of the Gilev's Grove | |||
}} | |||
{{Additional links and references | |||
|Link=http://park72.ru/city/72280/ | |||
|Description=brook Klyuchi before restoration | |||
}} | |||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | {{Toggle content end}} |
Latest revision as of 11:10, 12 March 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | http://https://72.ru/text/gorod/294961606352896.html |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits, Spatial planning, Water quality |
Country | Russia |
Main contact forename | Timur |
Main contact surname | Pavluk |
Main contact user ID | User:T.Pavluk |
Contact organisation | RosNIIVH |
Contact organisation web site | http://wrm.ru |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
Reconstruction of a unique forest park, which is located between two water objects - the Klyuchi stream and Lake Krivoe - began in 2015 and ended in November of 2016.
Objectives to be achieved:
1) Protection and restoration of the Klyuchi stream valley. The workers stabilized about 23 thousand square meters of slopes and re-designed the bed of the Klyuchi stream. New bridge-passage was built over the stream in the grove. After restoration works completion the unpleasant smell from the Klyuchi stream in the forest park was not traced anymore.
2) Allocation of entertainment facilities: large picnic mangal-barbeque zone. 19 arbors were installed along the stream. Swings were mounted for kids between arbors. Sanitation facilities were put nearby as well.
3) Installation of new playgrounds for children. They are designed for children of different ages and different interests. There are sandboxes and swings for toddlers and various sports equipment for tinagers. Comfortable benches installed carefully for parents throughout the gaming area.
4) Gilev's Grove had been and remains a great place for sports. In winter time there is a hockey box and illuminated ski track. In warm season active leisure lovers will enjoy a pleasant cycle path and six playgrounds for sports. People with pleasure ride on rollers, scooters, skateboards, bicycles and even roller skis, run and do Scandinavian walking.
5) For nature lovers the birds watch zone is equipped on the shore of Lake Krivoe. This part of the Grove is rarely crowded. Only birds singing violates silence of the beautiful view of the lake here.
6) Grove is a great place for photo shoots. Especially for the newlyweds, who often come here to capture the happy moments of their lives, an admiring white open-air pavilion not far from the central entrance was installed.
7) After reconstruction, figures of various animals appeared in the Gilev's Grove. The sculptures are very popular among children.
8) Park territory became as comfortable, as safe. On the territory 427 lanterns and more than 200 surveillance cameras were installed. Throughout the entire walking routes, new benches and litter bins were allocated.
9) Tyumen residents who came to the Grove by car, no longer need to worry about parking. New parking place was arranged for 468 cars.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|