Case study:Adare Fish Counter: Difference between revisions
(Created page with "{{Project overview |Status=Complete |Country=Ireland |Main contact forename=Tony |Main contact surname=Brew |Multi-site=No |Project picture=Recessed section.jpg |Project summa...") |
No edit summary |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | |||
|Approval status=Approved | |||
}} | |||
{{Location | |||
|Location=52.66156408514409, -8.80575687786029 | |||
}} | |||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Fisheries, Social benefits | |||
|Country=Ireland | |Country=Ireland | ||
|Main contact forename=Tony | |Main contact forename=Tony | ||
|Main contact surname=Brew | |Main contact surname=Brew | ||
|Contact organisation url=opw.ie | |||
|Partner organisations=IFI | |||
|Name of parent multi-site project=Environmental River Enhancement Programme | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Recessed section.jpg | |Project picture=Recessed section.jpg | ||
|Picture description=Poured counter beds | |||
|Project summary=This project is to facilitate the re-opening of the Maigue Salmon fishery, by producing statistical evidence to allow accurate estimates of fish stocks.This project was carried out in-conjunction with OPW & IFI. | |Project summary=This project is to facilitate the re-opening of the Maigue Salmon fishery, by producing statistical evidence to allow accurate estimates of fish stocks.This project was carried out in-conjunction with OPW & IFI. | ||
|Monitoring surveys and results=Monitoring of fish stocks are ongoing. | |Monitoring surveys and results=Monitoring of fish stocks are ongoing. | ||
Line 16: | Line 27: | ||
Local recording of water levels allowed efficient project planning in the advent of high river flows (waterlevel.ie). | Local recording of water levels allowed efficient project planning in the advent of high river flows (waterlevel.ie). | ||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | |||
{{Site | |||
|Name=River Maigue | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background}} | |||
{{Motivations | |||
|Biological quality elements=Fish, Fish: Abundance, | |||
}} | |||
{{Measures | |||
|Planform / Channel pattern=Creation of fish passes, | |||
}} | |||
{{Hydromorphological quality elements header}} | |||
{{End table}} | |||
{{Biological quality elements header}} | |||
{{End table}} | |||
{{Physico-chemical quality elements header}} | |||
{{End table}} | |||
{{Other responses header}} | |||
{{End table}} | |||
{{Monitoring documents}} | |||
{{Monitoring documents end}} | |||
{{Additional Documents}} | |||
{{Additional Documents end}} | |||
{{Additional links and references header}} | |||
{{Additional links and references footer}} | |||
{{Supplementary Information}} | |||
{{Toggle content end}} |
Latest revision as of 08:32, 10 July 2018
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Social benefits |
Country | Ireland |
Main contact forename | Tony |
Main contact surname | Brew |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | http://opw.ie |
Partner organisations | IFI |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project is to facilitate the re-opening of the Maigue Salmon fishery, by producing statistical evidence to allow accurate estimates of fish stocks.This project was carried out in-conjunction with OPW & IFI.
Monitoring surveys and results
Monitoring of fish stocks are ongoing.
Lessons learnt
Stakeholder consultation and partnership critical for project success.
Resourcing the project with the most experienced staff ensured success.
Sequencing of work critical.
Specialist concrete saw facilitated retaining a significant section of the existing weir.
This retained good reference and control points for accurate setting out.Future maintenance issues should be given due consideration in the design process.
Detailed pre-works survey and design drawings critical to efficient planning and project delivery.
Local recording of water levels allowed efficient project planning in the advent of high river flows (waterlevel.ie).
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|