(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=64.9996956, 25.563745400000016 }} {{Project overview |Project title=Restoration of Oulujoki River |Status=In...") |
No edit summary |
||
(7 intermediate revisions by 3 users not shown) | |||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=In progress | |Status=In progress | ||
|Themes=Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology | |Themes=Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology | ||
|Country=Finland | |Country=Finland | ||
|Main contact forename= | |Main contact forename=Anne | ||
|Main contact surname= | |Main contact surname=Laine | ||
|Contact organisation= | |Contact organisation=Centre for Economic Development, Transport and the Environment for North Ostrobothnia | ||
|Multi-site= | |Multi-site=Yes | ||
|Project summary=The River Oulujoki was former known as an excellent salmon river. In the early 1940´s started constructions of the waterpower plants and fish migration was hindered. Nowadays there are seven waterpower plants in the River Oulujoki and the whole river is harnessed for water production. | |||
Restorations of the Oulujoki River started at 1998 as the aim of restoring the river for recreation, fishing, and tourism. Merikoski fishway was the first step towards more natural river corridor and enabling migrating fish to rise up to the lower reaches of the river. In the beginning of 2009 North Ostrobothnian and Kainuu Centres for Economic Development, Transport and the Environment and Finnish Game and Fisheries Research Institute started the project “Oulujoki fishways - planning and supportive actions” funded by European Regional Development Fund. The object was to recreate habitats and reproduction areas for trout for the whole river length. As part of this project fishway plans for six other water power plants was made. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Name=Oulujoki River | ||
{{Motivations}} | |Heavily modified water body=Yes | ||
{{Measures}} | |Protected species present=No | ||
|Invasive species present=No | |||
|Species=Salmon, Trouts, | |||
|Dominant hydrology=Artificially regulated, | |||
|Mean discharge category=100 - 1000 m³/s | |||
|Mn discharge=259 | |||
}} | |||
{{Project background | |||
|Project started=2009 | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Hydropower, Barriers to fish migration, | |||
|Hydromorphological quality elements=Continuity for organisms, | |||
|Biological quality elements=Fish | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Creation of fish passes, Creation of fish spawn nursing places, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 30: | Line 54: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 37: | Line 59: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 17:19, 12 November 2018
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology |
Country | Finland |
Main contact forename | Anne |
Main contact surname | Laine |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for North Ostrobothnia |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Merikoski fishway |
Project summary
The River Oulujoki was former known as an excellent salmon river. In the early 1940´s started constructions of the waterpower plants and fish migration was hindered. Nowadays there are seven waterpower plants in the River Oulujoki and the whole river is harnessed for water production.
Restorations of the Oulujoki River started at 1998 as the aim of restoring the river for recreation, fishing, and tourism. Merikoski fishway was the first step towards more natural river corridor and enabling migrating fish to rise up to the lower reaches of the river. In the beginning of 2009 North Ostrobothnian and Kainuu Centres for Economic Development, Transport and the Environment and Finnish Game and Fisheries Research Institute started the project “Oulujoki fishways - planning and supportive actions” funded by European Regional Development Fund. The object was to recreate habitats and reproduction areas for trout for the whole river length. As part of this project fishway plans for six other water power plants was made.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|