Case study:Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013): Difference between revisions
No edit summary |
No edit summary |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 15: | Line 15: | ||
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd. | |Contact organisation=freiland Environmental Consulting Civil Engineers Ltd. | ||
|Contact organisation url=www.freiland.at | |Contact organisation url=www.freiland.at | ||
|Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability | |Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability | ||
|Name of parent multi-site project=Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=The measure serves the purpose of ecological and hydrological improvement of the river Mur over a length of about 1400 m by dismantling the left bank. | |Project summary=The measure serves the purpose of ecological and hydrological improvement of the river Mur over a length of about 1400 m by dismantling the left bank. | ||
Line 35: | Line 36: | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site}} | ||
{{Project background}} | {{Project background | ||
{{Motivations}} | |Reach length directly affected=1400 | ||
{{Measures}} | |Project started=2009/01/01 | ||
|Project completed=2013/12/31 | |||
}} | |||
{{Motivations | |||
|Hydromorphological quality elements=Channel pattern/planform, | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Construction gravel bays, Creation of islands, Removal of bank reinforcements, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} |
Latest revision as of 16:59, 12 November 2018
Project overview
Status | Complete |
---|---|
Project web site | http://www.dramurci.eu/page/ |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology |
Country | Austria, Slovenia |
Main contact forename | Jörg |
Main contact surname | Raderbauer |
Main contact user ID | User:9984 |
Contact organisation | freiland Environmental Consulting Civil Engineers Ltd. |
Contact organisation web site | http://www.freiland.at |
Partner organisations | Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability |
Parent multi-site project |
Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 |
This is a parent project encompassing the following projects |
No |
Project summary
The measure serves the purpose of ecological and hydrological improvement of the river Mur over a length of about 1400 m by dismantling the left bank.
In order to promote the erosion of the left bank, initial erosion scars (bays, excavation of approximately 15,000 cubic meters) were created and four temporary islands were built from pouring the existing excavated material into the Mur River.
The removal of bank protection and the therewith connected erosion will establish breaklines and a natural shoreline. Eroding banks and gravel bars will form new habitats for typical animal and plant species in and at the water.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|