Case study:Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013): Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 15: Line 15:
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd.
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd.
|Contact organisation url=www.freiland.at
|Contact organisation url=www.freiland.at
|Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability  
|Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability
|Name of parent multi-site project=Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013
|Multi-site=No
|Multi-site=No
|Project summary=The goal of this measure is an about 900 m long widening, a few meters downstream of the measure Gosdorf I, which was implemented in the first border-Mur-project (an Interreg IIIa project). The extension of dissolving the "shore corset" of the Mur and the initiation of typical river habitats shall promote the dynamic development and contribute to a fully revitalised section. At normal water levels the side-arm serves as a retreat area for small fish species in the river Mur (standing water zone).
|Project summary=The goal of this measure is an about 900 m long widening, a few meters downstream of the measure Gosdorf I, which was implemented in the first border-Mur-project (an Interreg IIIa project). The extension of dissolving the "shore corset" of the Mur and the initiation of typical river habitats shall promote the dynamic development and contribute to a fully revitalised section. At normal water levels the side-arm serves as a retreat area for small fish species in the river Mur (standing water zone).
}}
}}
{{Image gallery}}
{{Image gallery}}
{{Case study image
|File name=GosdorfII 2013 2.JPG
|Caption=River widening measure Gosdorf II - distributary outflow 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland
}}
{{Case study image
|File name=Pic 03 DraMurCi GosdorfII.JPG
|Caption=River widening measure Gosdorf II - distributary 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland
}}
{{Image gallery end}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle button}}
Line 25: Line 34:
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site}}
{{Project background}}
{{Project background
{{Motivations}}
|Reach length directly affected=900
{{Measures}}
|Project started=2009/01/01
|Project completed=2013/12/31
}}
{{Motivations
|Hydromorphological quality elements=Channel pattern/planform,
}}
{{Measures
|Bank and bed modifications measure=habitat improvements,
|Planform / Channel pattern=Channel widening, Habitat creation,
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}

Latest revision as of 15:09, 2 January 2019

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 46° 43' 21.13" N, 15° 50' 0.96" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.dramurci.eu/page/
Themes Environmental flows and water resources, Habitat and biodiversity, Hydromorphology
Country Austria, Slovenia
Main contact forename Jörg
Main contact surname Raderbauer
Main contact user ID User:9984
Contact organisation freiland Environmental Consulting Civil Engineers Ltd.
Contact organisation web site http://www.freiland.at
Partner organisations Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability
Parent multi-site project

Case study:Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The goal of this measure is an about 900 m long widening, a few meters downstream of the measure Gosdorf I, which was implemented in the first border-Mur-project (an Interreg IIIa project). The extension of dissolving the "shore corset" of the Mur and the initiation of typical river habitats shall promote the dynamic development and contribute to a fully revitalised section. At normal water levels the side-arm serves as a retreat area for small fish species in the river Mur (standing water zone).

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


River widening measure Gosdorf II - distributary outflow 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland
River widening measure Gosdorf II - distributary 2013 (ETZ-Project “DraMurCi” 2009-2013) © freiland
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 900900 m <br />0.9 km <br />90,000 cm <br />
Project started 2009/01/01
Works started
Works completed
Project completed 2013/12/31
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications habitat improvements
Floodplain / River corridor
Planform / Channel pattern Channel widening, Habitat creation
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information