Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008: Difference between revisions
No edit summary |
No edit summary |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
}} | }} | ||
{{Location | {{Location | ||
|Location=46. | |Location=46.7207204108846, 15.817614734205563 | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url=www.unteresmurtal.steiermark.at/ | |Project web site url=www.unteresmurtal.steiermark.at/ | ||
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology | |Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology | ||
|Country=Austria | |Country=Austria, Slovenia | ||
|Main contact forename=Jörg | |Main contact forename=Jörg | ||
|Main contact surname=Raderbauer | |Main contact surname=Raderbauer | ||
Line 15: | Line 15: | ||
|Contact organisation=freiland Environmental Consulting Civil Engineers Ltd. | |Contact organisation=freiland Environmental Consulting Civil Engineers Ltd. | ||
|Contact organisation url=www.freiland.at | |Contact organisation url=www.freiland.at | ||
|Partner organisations=Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=In accordance with the division designated for the INTERREG IIIA Project, the Lower Mur Valley habitat encompasses the Austrian border segment of the Mur River between Spielfeld and Sicheldorf (the “Grenzmur”), which forms the border to Slovenia, as well as the alluvial and cultural landscape bordering it to the north, with a total area of approx. 137 km². In western and eastern direction the area extends from Spielfeld all the way to the Austrian-Slovenian state border near Bad Radkersburg. This region encompasses the “Styrian Grenzmur with the Gamlitzbach and Gnasbach streams” European nature reserve, as well as, in part, the “Parts of the South-East Styrian hill country, including Höll and Grabenland streams” European nature reserve. | |Project summary=In accordance with the division designated for the INTERREG IIIA Project, the Lower Mur Valley habitat encompasses the Austrian border segment of the Mur River between Spielfeld and Sicheldorf (the “Grenzmur”), which forms the border to Slovenia, as well as the alluvial and cultural landscape bordering it to the north, with a total area of approx. 137 km². In western and eastern direction the area extends from Spielfeld all the way to the Austrian-Slovenian state border near Bad Radkersburg. This region encompasses the “Styrian Grenzmur with the Gamlitzbach and Gnasbach streams” European nature reserve, as well as, in part, the “Parts of the South-East Styrian hill country, including Höll and Grabenland streams” European nature reserve. | ||
Line 21: | Line 22: | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=Uebersicht Unteres Murtal.jpg | |||
|Caption=Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 - project overview | |||
}} | |||
{{Case study image | |||
|File name=Gosdorf Besucherturm.JPG | |||
|Caption=Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 - Murturm | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 26: | Line 35: | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site}} | ||
{{Project background}} | {{Project background | ||
|Reach length directly affected=1800 | |||
|Project started=2003/01/01 | |||
|Project completed=2008/12/31 | |||
|Total cost category=1000 - 5000 k€ | |||
|Total1 cost=3800 | |||
|Funding sources=EU Interreg IIIA (50 %), | |||
}} | |||
{{Motivations}} | {{Motivations}} | ||
{{Measures}} | {{Measures | ||
|Bank and bed modifications measure=reactivation and extending of tributary streams, Bed load addition | |||
|Floodplain / River corridor=Regeneration of alluvial forests, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} |
Latest revision as of 15:30, 2 January 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.unteresmurtal.steiermark.at/ |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology |
Country | Austria, Slovenia |
Main contact forename | Jörg |
Main contact surname | Raderbauer |
Main contact user ID | User:9984 |
Contact organisation | freiland Environmental Consulting Civil Engineers Ltd. |
Contact organisation web site | http://www.freiland.at |
Partner organisations | Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In accordance with the division designated for the INTERREG IIIA Project, the Lower Mur Valley habitat encompasses the Austrian border segment of the Mur River between Spielfeld and Sicheldorf (the “Grenzmur”), which forms the border to Slovenia, as well as the alluvial and cultural landscape bordering it to the north, with a total area of approx. 137 km². In western and eastern direction the area extends from Spielfeld all the way to the Austrian-Slovenian state border near Bad Radkersburg. This region encompasses the “Styrian Grenzmur with the Gamlitzbach and Gnasbach streams” European nature reserve, as well as, in part, the “Parts of the South-East Styrian hill country, including Höll and Grabenland streams” European nature reserve.
During the 5-year project (2003-2008), 220,000 m³ of bed load were added along a total stretch of 1,800 m in order to prevent any further depth erosion of the riverbed of the Mur. Furthermore 32 ha of dynamic Mur and alluvial habitat were created as well as a total of 45,000 m tributary streams were reactivated and/or extended. The total value of this four year project was 3.8 million €. 50% of the project was financed by the European Union (Interreg IIIa), whereas national contributions are distributed variably between project applicant and co-financers.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|