Case study:Enler River enhancement project: Difference between revisions
No edit summary |
No edit summary |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | |||
{{Location | |||
|Location=54.58982899999999, -5.789864599999987 | |||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
Line 10: | Line 12: | ||
|Main contact surname=Bankhead | |Main contact surname=Bankhead | ||
|Main contact id=Judithbankhead | |Main contact id=Judithbankhead | ||
|Contact organisation=Rivers Agency | |Contact organisation=Rivers Agency Northern Ireland (DARDNI) | ||
|Contact organisation url=www.dardni.gov.uk/rivers | |Contact organisation url=www.dardni.gov.uk/rivers | ||
|Partner organisations=Rivers Agency, DCAL Inland Fisheries, Castlereagh Borough Council | |Partner organisations=Rivers Agency Northern Ireland (DARDNI), DCAL Inland Fisheries, Castlereagh Borough Council | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=P4180319.JPG | |Project picture=P4180319.JPG | ||
Line 44: | Line 46: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
|Subcatchment=Comber | |||
}} | |||
{{Site | {{Site | ||
|Name=Enler River | |Name=Enler River | ||
Line 93: | Line 97: | ||
|Monitoring Other contact surname=Toland | |Monitoring Other contact surname=Toland | ||
}} | }} | ||
{{Motivations}} | {{Motivations | ||
{{Measures}} | |Biological quality elements=Fish, | ||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Deflectors, Creation of groynes, Riffle creation, Introduction of spawning gravels, Fish habitat restoration, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{Hydromorphological quality element table row | {{Hydromorphological quality element table row | ||
Line 100: | Line 108: | ||
|Monitored before=Yes | |Monitored before=Yes | ||
|Monitored after=Yes | |Monitored after=Yes | ||
|Qualitative monitoring= | |Qualitative monitoring=Yes | ||
|Quantitative monitoring= | |Quantitative monitoring=No | ||
|Control site used=No | |Control site used=No | ||
|Result=Improvement | |Result=Improvement | ||
Line 118: | Line 126: | ||
|Monitored before=Yes | |Monitored before=Yes | ||
|Monitored after=Yes | |Monitored after=Yes | ||
|Qualitative monitoring= | |Qualitative monitoring=Yes | ||
|Quantitative monitoring=No | |Quantitative monitoring=No | ||
|Control site used=No | |Control site used=No | ||
Line 125: | Line 133: | ||
{{End table}} | {{End table}} | ||
{{Biological quality elements header}} | {{Biological quality elements header}} | ||
{{Biological quality element table row | |||
|Element=Fish | |||
|Monitored before=Yes | |||
|Monitored after=No | |||
|Qualitative monitoring=No | |||
|Quantitative monitoring=No | |||
|Control site used=No | |||
}} | |||
{{Biological quality element table row | |||
|Monitored before=No | |||
|Monitored after=No | |||
|Qualitative monitoring=No | |||
|Quantitative monitoring=No | |||
|Control site used=No | |||
}} | |||
{{End table}} | {{End table}} | ||
{{Physico-chemical quality elements header}} | {{Physico-chemical quality elements header}} |
Latest revision as of 12:12, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology |
Country | Northern Ireland |
Main contact forename | Judith |
Main contact surname | Bankhead |
Main contact user ID | User:Judithbankhead |
Contact organisation | Rivers Agency Northern Ireland (DARDNI) |
Contact organisation web site | http://www.dardni.gov.uk/rivers |
Partner organisations | Rivers Agency Northern Ireland (DARDNI), DCAL Inland Fisheries, Castlereagh Borough Council |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Enler River is a typical arterially drained channel with laminar flow, regular depth and silt deposition. Compensation money from a fish kill prosecution allowed fishery enhancement measures to be planned and implemented. These included deflector groynes to narrow the channel and creat a thalweg, addition of spawning gravels and plums, and the creation of deeper water via a small cross river groyne
Monitoring surveys and results
Pre works fishery assessment and river habitat assessment were carried out, along with photographs. Post works photographs have been taken and this will continue. One year plus fishery assessment and habitat assessment planned for 2015.
Lessons learnt
Opportunisitc work due to compensation monies and public land ownership. The proximity of the Greenway cycle way, and high value market gardening land meant that the reach length had to be limited, and work constrained within the current channel dimensions. Lunkers that had been obtained for inlcusion in the scheme could not be used due to size issues - used elsewhere.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|