Case study:Restoration project in Turia River: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology, Social benefits | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=C.H.Júcar | |Main contact forename=C.H.Júcar | ||
Line 20: | Line 16: | ||
The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; social use. | The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; social use. | ||
Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria. | Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria. | ||
}} | }} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=Turiariver.1.png | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 103: | Line 101: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Revetmens with local species,Weir removal | ||
|Floodplain / River corridor=Removal of exotic plants,Elimination of structural elements concreted | |||
|Social measures=Improved public access, | |||
|Floodplain / River corridor= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:02, 5 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology, Social benefits |
Country | Spain |
Main contact forename | C.H.Júcar |
Main contact surname | C.H.Júcar |
Main contact user ID | |
Contact organisation | C.H.Júcar |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
As part of the National River Restoration (ENRR), it has been selected 10 river reaches of the Confederation Júcar (CHJ), in which restoration projects will be developed. One of these sections corresponds to the Turia River in a stretch of 15.6 km upstream of the Turia Natural Park. The purpose of the restoration of that reach is the recovery of good ecological status, required for the WFD by 2015. Thus, the actions proposed are targets in the short and long term, all framed in ENRR and the WFD.
The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; social use.
Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|