{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Themes=Flood risk management, Hydromorphology
   
|Country=Finland
      Complete
|Main contact forename=Markus
|Project web site url=
|Main contact surname=Tapaninen
     
|Main contact id=Arolam
|Themes=
|Contact organisation=Centre for Economic Development, Transport and the Environment for Southeast Finland
      Flood risk management
|Contact organisation url=www.healfish.eu/index.php?option=com_content&view=article&id=23&Itemid=33&lang=fi
|Country=
|Multi-site=No
      Finland
|Project picture=After1.JPG
|Main contact forename=
|Picture description=After restoration (photo. Markus Tapaninen)
     
|Project summary=Vaalimaanjoen kunnostukset keskittyvät Reinikkalankosken vanhan sääntelypadon korvaamiseen pohjapadolla ja kalatiellä. Työt keskittyvät matalanveden aikaan, koska muutostöiden aikana veden täytyy virrata voimalaitoksen läpi. Padon poiston jälkeen uomaan reunoja louhitaan. Irralliset kivet kiinnitetään paikoilleen. Pohjapato täytetään hiekalla, soralla ja kiveyksellä. Padon harjalle levitetään kutusoraa. Kalatiestä kivetään 3-5 metriin leveä uoma. Kunnostustöiden ansiosta vaelluskaloille avautuu mahdollisuus nousta joen yläjuoksulle.
|Main contact surname=
 
     
The restoration was complited as a part of the Interreg IV C funded HEALFISH Project.
|Main contact id=
}}
     
{{Image gallery}}
|Contact organisation=
{{Case study image
     
|File name=1.Restoration of Reinikkalankoski torrent before restoration (photo by Jukka Jormola).jpg
|Contact organisation url=
|Caption=Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_1
     
}}
|Partner organisations=
{{Case study image
     
|File name=Before.JPG
|Multi-site=
|Caption=Before restoration (photo.Markus Tapaninen)
     
}}
|Name of parent multi-site project=
{{Case study image
     
|File name=2.Restoration of Reinikkalankoski torrent before restoration (photo. Jukka Jormola) (2).JPG
|Project picture=
|Caption=Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_2
     
}}
|Picture description=
{{Case study image
     
|File name=3.Restoration of Reinikkalankoski torrent before dam removal (photo by Jukka Jormola).JPG
|Project summary=
|Caption=Restoration of Reinikkalankoski torrent before dam removal (photo: Jukka Jormola)
     
}}
{{Case study image
|File name=Work1.JPG
|Caption=Restoring the stream (photo. Markus Tapaninen)
}}
{{Case study image
|File name=Work2.JPG
|Caption=Restoring the stream (photo. Markus Tapaninen)
}}
{{Case study image
|File name=4.Restoration of Reinikkalankoski torrent after dam removal (photo by Jukka Jormola).JPG
|Caption=Restoration of Reinikkalankoski torrent after dam removal (photo: Jukka Jormola)
}}
{{Case study image
|File name=After2.JPG
|Caption=After restoration (photo. Markus Tapaninen)
}}
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 187: Line 200:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Re-introducing stones,Building submerged weir, Creation of fish passes,
   
   
      Re-introducing stones,Building submerged weir,Building fishways
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 251: Line 249:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
{{Case study image
|File name=1.Restoration of Reinikkalankoski torrent before restoration (photo by Jukka Jormola).jpg
|Caption=Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)
}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 283: Line 275:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 08:36, 2 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 34' 44.24" N, 27° 49' 58.08" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Hydromorphology
Country Finland
Main contact forename Markus
Main contact surname Tapaninen
Main contact user ID User:Arolam
Contact organisation Centre for Economic Development, Transport and the Environment for Southeast Finland
Contact organisation web site http://www.healfish.eu/index.php?option=com content&view=article&id=23&Itemid=33&lang=fi
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
After restoration (photo. Markus Tapaninen)

Project summary

Edit project overview to modify the project summary.


Vaalimaanjoen kunnostukset keskittyvät Reinikkalankosken vanhan sääntelypadon korvaamiseen pohjapadolla ja kalatiellä. Työt keskittyvät matalanveden aikaan, koska muutostöiden aikana veden täytyy virrata voimalaitoksen läpi. Padon poiston jälkeen uomaan reunoja louhitaan. Irralliset kivet kiinnitetään paikoilleen. Pohjapato täytetään hiekalla, soralla ja kiveyksellä. Padon harjalle levitetään kutusoraa. Kalatiestä kivetään 3-5 metriin leveä uoma. Kunnostustöiden ansiosta vaelluskaloille avautuu mahdollisuus nousta joen yläjuoksulle.

The restoration was complited as a part of the Interreg IV C funded HEALFISH Project.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_1
Before restoration (photo.Markus Tapaninen)
Restoration of Reinikkalankoski torrent before restoration (photo: Jukka Jormola)_2
Restoration of Reinikkalankoski torrent before dam removal (photo: Jukka Jormola)
Restoring the stream (photo. Markus Tapaninen)
Restoring the stream (photo. Markus Tapaninen)
Restoration of Reinikkalankoski torrent after dam removal (photo: Jukka Jormola)
After restoration (photo. Markus Tapaninen)
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district
River basin Vaalimaanjoki River Basin

Subcatchment

River name Vaalimaanjoki River
Area category 100 - 1000 km²
Area (km2) 242 km²24,200 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Fenno-Scandian Shield
Dominant land cover Woodland
Waterbody ID



Site

Name Reinikkalankoski torrent
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology dam
Reference morphology Pool-riffle
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral
Dominant substrate
River corridor land use Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Quantity & dynamics of flow, Continuity for organisms
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Re-introducing stones, Building submerged weir, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Quantity & dynamics of flow Awaiting results
Continuity for organisms Awaiting results

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative