Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.: Difference between revisions
(XML import) |
No edit summary |
||
(9 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=39.00491168506384, -5.767478942871094 | ||
}} | |||
{{Project overview | |||
|Status=Complete | |||
|Project web site url=www.mma.es/secciones/acm/aguas continent zonas asoc/dominio hidraulico/conserv restaur/pdf/Rio Zujar Vado Entrerrios.pdf | |||
|Country=Spain | |||
|Main contact forename=C.H. | |||
|Main contact surname=Guadiana | |||
|Contact organisation=MARM | |||
|Name of parent multi-site project=Case_study:Environmental restoration of the river Zújar | |||
|Multi-site=No | |||
|Project summary=The Zújar project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects. | |||
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=033 Rio Zujar desembocadura CHGUADIANA 004.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=033 Rio Zujar desembocadura CHGUADIANA 004 I.jpg | |||
|Caption=Zujar River before works | |||
}} | }} | ||
{{ | {{Case study image | ||
| | |File name=033 Rio Zujar desembocadura CHGUADIANA 004 II.jpg | ||
|Caption=Zujar River before works | |||
| | |||
}} | }} | ||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 190: | Line 177: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Creation of wetland | |||
|Other technical measure=Recovering natural landscapes | |||
|Floodplain / River corridor= | |||
|Other technical measure= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 217: | Line 190: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Additional Documents}} | ||
{{ | {{Case study documents | ||
|File name=033 Rio Zujar desembocadura.pdf | |||
|Description=Additional documentation (in Spanish) | |||
}} | |||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} | ||
Line 225: | Line 200: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 09:34, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | http://www.mma.es/secciones/acm/aguas%20continent%20zonas%20asoc/dominio%20hidraulico/conserv%20restaur/pdf/Rio%20Zujar%20Vado%20Entrerrios.pdf |
Themes | |
Country | Spain |
Main contact forename | C.H. |
Main contact surname | Guadiana |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Zújar project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects.
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Environmental restoration of the river Zújar, Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|