Case study:Seseke Remodelling: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.58683245856188, 7.7133121495717205 }} {{Project overview |Project title=Seseke Remodelling |Status=Comple...") |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Hydromorphology | |||
|Country=Germany | |Country=Germany | ||
|Main contact forename=Mechthild | |Main contact forename=Mechthild | ||
|Main contact surname=Semrau | |Main contact surname=Semrau | ||
|Main contact id=EGLV | |Main contact id=EGLV | ||
|Contact organisation= | |Contact organisation=Lippeverband | ||
|Contact organisation url=eglv.de | |||
|Multi-site=Yes | |Multi-site=Yes | ||
|Project summary=Part of the integrated river basin management for the Seseke Region (315 km<sup>2</sup>) is the revitalization of the river Seseke and its tributaries. Due to industrialization the waterbodies were systematically developed as open wastewater sewers at the beginning of the 20<sup>th</sup> century. Economic and technical alternatives such as closed sewer systems could not be implemented due to constant subsidence caused by mining. | |||
The river system will be restructured, so that the Seseke will become a fully functioning, continous water-based ecosystem with typical topologies and vegetation. | |||
Studies on the feasibility of restructuring the Seseke show, that due to coal mining, industrial and population changes the “original” conditions can never be reached again. It will not be possible to return the Seseke to its original, meandering state. So the reference conditions are no direct goals for the river restoration, but they give orientation in the planning procedure. | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} |
Latest revision as of 13:38, 4 June 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | Germany |
Main contact forename | Mechthild |
Main contact surname | Semrau |
Main contact user ID | User:EGLV |
Contact organisation | Lippeverband |
Contact organisation web site | http://eglv.de |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
Part of the integrated river basin management for the Seseke Region (315 km2) is the revitalization of the river Seseke and its tributaries. Due to industrialization the waterbodies were systematically developed as open wastewater sewers at the beginning of the 20th century. Economic and technical alternatives such as closed sewer systems could not be implemented due to constant subsidence caused by mining.
The river system will be restructured, so that the Seseke will become a fully functioning, continous water-based ecosystem with typical topologies and vegetation.
Studies on the feasibility of restructuring the Seseke show, that due to coal mining, industrial and population changes the “original” conditions can never be reached again. It will not be possible to return the Seseke to its original, meandering state. So the reference conditions are no direct goals for the river restoration, but they give orientation in the planning procedure.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|