Line 24: Line 21:
The maintenance of 2687 m of riparian forest and new plantation along 1400 m of river banks were carried on.  
The maintenance of 2687 m of riparian forest and new plantation along 1400 m of river banks were carried on.  
}}
}}
{{Image_gallery}}
{{Image gallery}}
{{Case study image
|File name=Langonnet cs 1.jpg
|Caption=Examples of intervention on the Lagonnet river.
}}
{{Case study image
|File name=Langonnet cs 2.jpg
|Caption=Blocks put in place on the Lagonnet river bed.
}}
{{Image_gallery_end}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle button}}
Line 35: Line 40:
}}
}}
{{Site
{{Site
|Name=
|Name=Langonnet River
   
|WFD water body code=FRJ471400A
   
|WFD (national) typology=HER1-12 / HER2-60  
      Langonnet River
|Pre-project morphology=Single channel,Straight
|WFD water body code=
|Reference morphology=Single channel,Sinuous
      FRJ471400A
|Heavily modified water body=No
|WFD (national) typology=
|Protected species present=No
      HER1-12 / HER2-60 (FRJ471400A
|Invasive species present=No
|WFD water body name=
|Avrg channel gradient=0.005117
     
|Pre-project morphology=
      Single channel,Straight
|Reference morphology=
      Single channel,Sinuous
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
      0.005117
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=5300 m
   
|Project started=2000/01/01
   
|Works started=2004/01/01
      5300 m
|Works completed=2006/01/01
|Project started=
|Total cost category=more than 10000 k€
      2000/01/01
|Total1 cost=150.315
|Works started=
|Funding sources=l'Etat et la Région (Volet "Milieux aquatiques et poissons migrateurs" CPER 2000-2006), l'Agence de l'Eau Loire-Bretagne (50%), la Région Bretagne (15%), le Conseil Général du Morbihan (15%) et les Pêcheurs (20%).
     
|Investigation and design Lead organisation=Fishermen (20%)
|Works completed=
|Investigation and design Other contact forename=Yohann Fuentes
      2006/01/01
|Monitoring1 cost category=1 - 10 k€
|Project completed=
|Monitoring Lead organisation=FDPPMA 56.
     
|Total cost category=
      more than 10000 k€
|Total1 cost=
     
|Funding sources=
     
|Investigation and design cost category=
      more than 10000 k€
|Invst and design cost=
      150315 k€
|Investigation and design Lead organisation=
      Fishermen (20%)
|Investigation and design Other contact forename=
      Yohann Fuentes
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
      5000 - 10000 k€
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
      FDPPMA 56.
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 171: Line 78:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Creation of pools and riffles, Creation of groynes, introduction of blocks, Creation of berms,
   
|Floodplain / River corridor=Develop riparian forest, Tree plantation,
   
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
      re-meandering
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 259: Line 152:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Additional_Documents}}
{{Additional Documents}}
{{Case study documents
|File name=http://www.restauration.georiv.fr/resources/langonnet_cs.pdf
|Description=Case study description (in French)
}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional_links_and_references_header}}

Latest revision as of 09:11, 6 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 48° 5' 33.92" N, 3° 30' 18.48" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology, Monitoring, Water quality
Country France
Main contact forename Yohann
Main contact surname FUENTES
Main contact user ID
Contact organisation (FORECASTER)
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Over the years, heavy hydraulic works were carried out on the Lagonnet River, such as straightening and widening of the river course, causing habitat depletion and lowering of the water table. The main goals of the restoration activity were to restore the morphology and functionality of the river and to improve the habitat diversification. A preliminary assessment, carried out in 2001, has defined the technical goals: to improve the longitudinal and cross section profile diversification, to define a narrower flow section (especially in low water) and a sequence of riffles and pools. The reactivation of the river dynamics allow to keep the restoration results on the long term. The works included the installation of 24 sills and 239 groynes (in blocks or wooden). Berms are also created along 250 m and blocks are put in place on the riverbed. The maintenance of 2687 m of riparian forest and new plantation along 1400 m of river banks were carried on.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Examples of intervention on the Lagonnet river.
Blocks put in place on the Lagonnet river bed.
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Loire-Bretagne
River basin Loire

Subcatchment

River name Langonnet
Area category 10 - 100 km²
Area (km2) 34 km²3,400 ha <br />
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Plains
Dominant land cover
Waterbody ID



Site

Name Langonnet River
WFD water body codes FRJ471400A
WFD (national) typology HER1-12 / HER2-60
WFD water body name
Pre-project morphology Single channel, Straight
Reference morphology Single channel, Sinuous
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient 0.005117
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 5300 m5.3 km <br />530,000 cm <br />
Project started 2000/01/01
Works started 2004/01/01
Works completed 2006/01/01
Project completed
Total cost category more than 10000 k€
Total cost (k€) 150.315150.315 k€ <br />150,315 € <br />
Benefit to cost ratio
Funding sources l'Etat et la Région (Volet "Milieux aquatiques et poissons migrateurs" CPER 2000-2006), l'Agence de l'Eau Loire-Bretagne (50%), la Région Bretagne (15%), le Conseil Général du Morbihan (15%) et les Pêcheurs (20%).

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Fishermen (20%) Yohann Fuentes
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring 1 - 10 k€ FDPPMA 56.



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Quantity & dynamics of flow, Width & depth variation
Biology Fish: Species composition
Physico-chemical Temperature
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Creation of pools and riffles, Creation of groynes, introduction of blocks, Creation of berms
Floodplain / River corridor Develop riparian forest, Tree plantation
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Yes

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Species composition Yes Yes

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Temperature Yes Yes


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information