Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572: Difference between revisions
Anna.polazzo (talk | contribs) No edit summary |
No edit summary |
||
(11 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 16: | Line 16: | ||
The project aimed to help the conservation, rehabilitation and extension of the river and riverbank habitats along a stretch of the river Toce downstream Domodossola. | The project aimed to help the conservation, rehabilitation and extension of the river and riverbank habitats along a stretch of the river Toce downstream Domodossola. | ||
The project achieved some relevant results such as the creation of an area with different water levels down to a maximum depth of 1 m, thus favouring amphibians and birds in the locality of Prata (Municipality of Vogogna); the reduction of the presence of invasive exotic trees and shrubs in termophilous shrub habitats; the maintenance of suitable habitat for nesting birds in the lowland hay meadows through specific management intervention consisting in mowing; the creation of new alluvial forests. | The project achieved some relevant results such as the creation of an area with different water levels down to a maximum depth of 1 m, thus favouring amphibians and birds in the locality of Prata (Municipality of Vogogna); the reduction of the presence of invasive exotic trees and shrubs in termophilous shrub habitats; the maintenance of suitable habitat for nesting birds in the lowland hay meadows through specific management intervention consisting in mowing; the creation of new alluvial forests. | ||
|Monitoring surveys and results=The results of the monitoring survey started in 2003 revealed an increase of some bird species using the restored habitats as nesting, feeding and hunting (raptors) areas as a positive consequence of the interventions, especially in the lowland hay meadows and in the dry scrublands. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Toce-eutrophic lake before the activities.jpg | |||
|Caption=Eutrophic lake before the activities. | |||
}} | |||
{{Case study image | |||
|File name=Toce- eutrophic lake after the activities.jpg | |||
|Caption=Eutrophic lake after the activities. | |||
}} | |||
{{Case study image | |||
|File name=Toce - River bank with scions of Salix.jpg | |||
|Caption=River bank with scions of Salix. | |||
}} | }} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 80: | Line 93: | ||
4.6 | 4.6 | ||
}} | }} | ||
{{ | {{Project background | ||
|Project started=2003/01/01 | |||
|Project completed=2006/12/31 | |||
|Total1 cost=532.708 | |||
|Funding sources=UE founds (LIFE02 NAT/IT/008572), Provincia del Verbano-Cuneo-Ossola | |||
|Project started= | |||
|Project completed= | |||
|Total1 cost= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 157: | Line 104: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Morphological diversification | ||
|Floodplain / River corridor=Control of invasive species, Riparian planting, | |||
|Management interventions=Limitation of access to the river; conservation of mobility area | |||
|Floodplain / River corridor= | |||
|Management interventions= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 239: | Line 173: | ||
}} | }} | ||
{{End_table}} | {{End_table}} | ||
{{ | {{Other responses header}} | ||
{{ | {{Other response table row | ||
|Element= | |Element=Birds | ||
|Monitored before=Yes | |||
|Monitored after=Yes | |||
|Qualitative monitoring=No | |||
|Quantitative monitoring=No | |||
|Control site used=No | |||
|Monitored before= | |Result=Improvement | ||
|Monitored after= | |||
|Qualitative monitoring= | |||
|Quantitative monitoring= | |||
|Control site used= | |||
|Result= | |||
}} | }} | ||
{{End_table}} | {{End_table}} |
Latest revision as of 11:57, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Italy |
Main contact forename | Barbara |
Main contact surname | Lomazzi |
Main contact user ID | |
Contact organisation | Verbania County |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river Toce in the Alps is the next largest tributary of Lake Maggiore after the river Ticino. It is a very important site for nesting birds and especially migrating birds including priority species, such as the corncrake (Crex crex). The Toce fulfils a vital role as an ecological corridor across the Alps during bird migration.
The project aimed to help the conservation, rehabilitation and extension of the river and riverbank habitats along a stretch of the river Toce downstream Domodossola.
The project achieved some relevant results such as the creation of an area with different water levels down to a maximum depth of 1 m, thus favouring amphibians and birds in the locality of Prata (Municipality of Vogogna); the reduction of the presence of invasive exotic trees and shrubs in termophilous shrub habitats; the maintenance of suitable habitat for nesting birds in the lowland hay meadows through specific management intervention consisting in mowing; the creation of new alluvial forests.
Monitoring surveys and results
The results of the monitoring survey started in 2003 revealed an increase of some bird species using the restored habitats as nesting, feeding and hunting (raptors) areas as a positive consequence of the interventions, especially in the lowland hay meadows and in the dry scrublands.
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|