Case study:Witzelsdorf Pilot Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 31: Line 31:
{{Toggle button}}
{{Toggle button}}
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment
|Subcatchment=Danube
}}
{{Site}}
{{Site}}
{{Project background}}
{{Project background}}

Latest revision as of 13:08, 20 September 2013

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 48° 7' 38.17" N, 16° 50' 42.59" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.donauauen.at/?story_id=1713
Themes Environmental flows and water resources, Flood risk management
Country Austria
Main contact forename Stefan
Main contact surname Schneeweihs
Main contact user ID User:Nationalpark Donau-Auen
Contact organisation Nationalpark Donau-Auen
Contact organisation web site http://http://www.donauauen.at/?area=nationalpark&language=english
Partner organisations
Parent multi-site project

Case_study:National Park Danube-Auen

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Another milestone in revitalization for via donau in 2009: completion of construction of a riverbank restoration project at Witzelsdorf in the Donau-Auen National Park. The Witzelsdorf section of the river had been one of the most heavily built-up along the entire Danube. Thus ideal conditions prevailed here for a restoration aiming to improve the overall ecological situation: to encourage the momentum and formative power of the Danube and to initiate the natural development of the shore. Project measures included:

  • Removal of eight old groynes and field experiments involving novel, ecologically-optimized groyne structures
  • Lowering of existing retaining walls to 0.5 meters above the low navigable water level (LNWL)
  • Riverbank restoration on a stretch nearly two kilometres long between river kilometres 1891.7 and 1893.4 with preservation of bank revetments to just over LNWL in areas of strong currents.

Approximately 30,000 m3 stone material was removed from the banks and transported away by ship. The National Park provided professional support for this project in collaboration with the project team. The Witzelsdorf restoration project was co-financed by the Federal Ministry of Transport, Innovation and Technology (BMVIT) and the trans-European networks of the European Union. Meanwhile, the Danube has been busy forming her newly-won natural banks. The second riverbank restoration project in the Donau-Auen National Park is thus a veritable success story.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Danube
River basin Danube

Subcatchment

River name Sava River
Area category more than 10000 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 833833 m <br />0.833 km <br />83,300 cm <br />
Dominant geology Calcareous
Ecoregion Dinaric Western Balkan, Alps
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Conservation of alluvial, Hainburg River Restoration, INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park, Marsh protection in Egyek–Pusztakócs, National Park Danube-Auen, Regelsbrunner Aue, Renaturation of Stržen's riverbed on intermittent Cerknica Lake, The Bulgarian Wetlands Restoration and Pollution Reduction Project


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information