Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 12: Line 7:
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology
|Country=Spain
|Country=Spain
|Main contact forename=CHTajo
|Main contact forename=CHTajo
|Main contact surname=CHTajo
|Main contact surname=CHTajo
|Contact organisation=CHTajo
|Multi-site=No
|Multi-site=No
|Project picture=035 Rio Manzanares.jpg
|Project summary=During the decade of the 40s, a small dam (9 meters high, 23 meters width) was built in the Manzanares River, in a site placed inside the Regional Park, in order to supply water to the village –Manzanares del Real- located few kilometers downstream. Year by year the dam has accumulated such a big quantity of sediments coming from the granite banks and slopes that at the end of the century it was completely full of sand, in such a way that it became useless.
|Project summary=During the decade of the 40s, a small dam (9 meters high, 23 meters width) was built in the Manzanares River, in a site placed inside the Regional Park, in order to supply water to the village –Manzanares del Real- located few kilometers downstream. Year by year the dam has accumulated such a big quantity of sediments coming from the granite banks and slopes that at the end of the century it was completely full of sand, in such a way that it became useless.
The main target was to give back to the river the natural features it had before the dam construction and to recover the longitudinal and transversal continuity.
The main target was to give back to the river the natural features it had before the dam construction and to recover the longitudinal and transversal continuity.
The river basin authority, that belongs to the Spanish Ministry of Environment -Confederación Hidrográfica del Tajo- in collaboration with other authorities (the local Council and the Madrid Autonomous Community), stated as an achievement this dam removal, in order to solve the problems the structure was inducing in the riverine ecosystem. The project has a total budget of 450.000€.
The river basin authority, that belongs to the Spanish Ministry of Environment -Confederación Hidrográfica del Tajo- in collaboration with other authorities (the local Council and the Madrid Autonomous Community), stated as an achievement this dam removal, in order to solve the problems the structure was inducing in the riverine ecosystem. The project has a total budget of 450.000€.
}}
}}
{{Image gallery}}
{{Image gallery}}
Line 201: Line 198:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Bank stabilisation,Dam removal
   
|Floodplain / River corridor=Riparian planting
   
      Bank stabilization,Dam removal
|Floodplain / River corridor=
      Riparian tree planting
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 13:37, 1 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 40° 44' 29.70" N, 3° 53' 21.75" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Hydromorphology
Country Spain
Main contact forename CHTajo
Main contact surname CHTajo
Main contact user ID
Contact organisation CHTajo
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


During the decade of the 40s, a small dam (9 meters high, 23 meters width) was built in the Manzanares River, in a site placed inside the Regional Park, in order to supply water to the village –Manzanares del Real- located few kilometers downstream. Year by year the dam has accumulated such a big quantity of sediments coming from the granite banks and slopes that at the end of the century it was completely full of sand, in such a way that it became useless. The main target was to give back to the river the natural features it had before the dam construction and to recover the longitudinal and transversal continuity. The river basin authority, that belongs to the Spanish Ministry of Environment -Confederación Hidrográfica del Tajo- in collaboration with other authorities (the local Council and the Madrid Autonomous Community), stated as an achievement this dam removal, in order to solve the problems the structure was inducing in the riverine ecosystem. The project has a total budget of 450.000€.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Aerial view of the restoration area
Dam before demolition
Removal of debris. Residues stacked by machinery were transported by helicopter for its withdrawal
Small plantations in the environment
Channel after the demolition of the dam in September 2007
Manzanares River in June 2008
Profile of the cross and longitudinal section
Sediments accumulated in pools
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Tajo
River basin Tajo

Subcatchment

River name Manzanares
Area category
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 980 m0.98 km <br />98,000 cm <br />
Dominant geology Siliceous
Ecoregion Ibero-Macaronesian
Dominant land cover Woodland
Waterbody ID



Site

Name Paraje del Tranco, Manzanares del Real
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations UNESCO Biosphere Reserve, Regional Park
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2008/01/01
Works started
Works completed 2008/01/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 450 k€450,000 € <br />
Benefit to cost ratio
Funding sources Department of Environment of the Community of Madrid, C.H.Tajo

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision C.H.Tajo
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Continuity for organisms, Continuity of sediment transport, Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Bank stabilisation, Dam removal
Floodplain / River corridor Riparian planting
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Yes Yes Yes Improvement
Structure & condition of riparian zones Yes Yes Yes Improvement

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information