Case study:Room for the River: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(3 intermediate revisions by 3 users not shown)
Line 7: Line 7:
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Project web site url=www.ruimtevoorderivier.nl/meta-navigatie/english/
|Themes=Habitat and biodiversity, Water quality
|Themes=Habitat and biodiversity, Water quality
|Country=Netherlands
|Country=Netherlands
Line 12: Line 13:
|Main contact surname=Blankvoort
|Main contact surname=Blankvoort
|Contact organisation=Rijkswaterstaat Oost-Nederland
|Contact organisation=Rijkswaterstaat Oost-Nederland
|Partner organisations=Dienst Landelijk Gebied,
|Multi-site=Yes
|Multi-site=Yes
|Project picture=Room for the River.png
|Project picture=Room for the River.png
|Picture description=Map of the Room for the River sites, the Netherlands
|Picture description=Map of the Room for the River sites, the Netherlands
|Project summary=The goal of the Dutch Room for the River Programme is to give the river more room to be able to manage higher water levels. At more than 30 locations, measures will be taken that give the river space to flood safely. Moreover, the measures will be designed in such a way that they improve the quality of the immediate surroundings. The Room for the River programme will be completed by approximately 2015.
}}
}}
{{Image_gallery}}
{{Image_gallery}}
Line 77: Line 80:
        
        
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Project started=2003/01/01
   
|Works completed=2008/01/01
   
|Project completed=2015/12/31
     
|Total cost category=more than 10000 k€
|Project started=
|Investigation and design Lead organisation=Rijkswaterstaat Oost-Nederland
      2003/01/01
|Stakeholder engagement Lead organisation=Rijkswaterstaat Oost-Nederland
|Works started=
|Works and supervision Lead organisation=Rijkswaterstaat Oost-Nederland
     
|Post-project management and maintenance Lead organisation=Rijkswaterstaat Oost-Nederland
|Works completed=
      2008/01/01
|Project completed=
     
|Total cost category=
      more than 10000 k€
|Total1 cost=
     
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
      Rijkswaterstaat Oost-Nederland
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
      Rijkswaterstaat Oost-Nederland
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
      Rijkswaterstaat Oost-Nederland
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
      Rijkswaterstaat Oost-Nederland
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=
|Specific mitigation=Agriculture, Urbanisation,
   
|Hydromorphological quality elements=Connection to groundwaters,Channel pattern/planform,Quantity & dynamics of flow
   
|Other motivation=Landscape enhancement
      Connection to groundwaters,Channel pattern/planform,Quantity & dynamics of flow
|Biological quality elements=
     
|Physico-chemical quality elements=
     
|Specific mitigation=
      Agriculture,Urban use
|Other motivation=
      Landscape enhancement
}}
}}
{{Measures
{{Measures

Latest revision as of 14:35, 21 June 2021

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 22' 31.80" N, 5° 37' 30.00" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.ruimtevoorderivier.nl/meta-navigatie/english/
Themes Habitat and biodiversity, Water quality
Country Netherlands
Main contact forename Rutger
Main contact surname Blankvoort
Main contact user ID
Contact organisation Rijkswaterstaat Oost-Nederland
Contact organisation web site
Partner organisations Dienst Landelijk Gebied
This is a parent project
encompassing the following
projects
Millingerwaard-Floodplain rehabilitation, Ontpoldering Noordwaard, Uiterwaardvergraving Keizers- en Stobbenwaarden en Olsterwaarden
Map of the Room for the River sites, the Netherlands

Project summary

Edit project overview to modify the project summary.


The goal of the Dutch Room for the River Programme is to give the river more room to be able to manage higher water levels. At more than 30 locations, measures will be taken that give the river space to flood safely. Moreover, the measures will be designed in such a way that they improve the quality of the immediate surroundings. The Room for the River programme will be completed by approximately 2015.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Rhine
River basin Rhine

Subcatchment

River name Rhine
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 1000 - 2000 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Plains
Dominant land cover Grassland, Urban
Waterbody ID



Other case studies in this subcatchment: Amerongse Bovenpolder, Bakenhof Dyke reconstruction, Blauwe Kamer, Ruppoldingen, Upper Main catchment restoration


Site

Name Hondsbroeksche Pleij
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Single channel, Revetments, High width:depth, Entrenched
Reference morphology Single channel, Sinuous, Pool-riffle
Desired post project morphology
Heavily modified water body true
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Quick run-off, Groundwater, Artificially regulated, Tidal
Dominant substrate Bedrock
River corridor land use Extensive agriculture, Urban, Grassland
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2003/01/01
Works started
Works completed 2008/01/01
Project completed 2015/12/31
Total cost category more than 10000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Rijkswaterstaat Oost-Nederland
Stakeholder engagement and communication Rijkswaterstaat Oost-Nederland
Works and works supervision Rijkswaterstaat Oost-Nederland
Post-project management and maintenance Rijkswaterstaat Oost-Nederland
Monitoring



Reasons for river restoration

Mitigation of a pressure Agriculture, Urbanisation
Hydromorphology Connection to groundwaters, Channel pattern/planform, Quantity & dynamics of flow
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications Removal of revetments, Reduction of bank slope
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Information provision, Consultation, Participation in works, Participation in design


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information