Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province): Difference between revisions
No edit summary |
No edit summary |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Social benefits | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=CHJ | |Main contact forename=CHJ | ||
Line 17: | Line 13: | ||
|Contact organisation url=www.chj.es/ | |Contact organisation url=www.chj.es/ | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=046 Rio Serpis.jpg | |||
|Project summary=In the Serpis River there are a variety of habitats, from riparian forest with undamaged stretches to Mediterranean forest. There are also elements of great cultural and heritage value, as mills from the XIX century. Anthropic pressure, mainly agriculture and hydropower industry makes necessary the restoration to ensure the ecological river corridor. | |Project summary=In the Serpis River there are a variety of habitats, from riparian forest with undamaged stretches to Mediterranean forest. There are also elements of great cultural and heritage value, as mills from the XIX century. Anthropic pressure, mainly agriculture and hydropower industry makes necessary the restoration to ensure the ecological river corridor. | ||
The actions of the project are: Recovery of the river mobility space; Recovery of river morphology: recovery of the steepness of the slopes of the channel and the original path of the river (oxbow connection); Recovery of longitudinal continuity: demolition of 5 obsolete weirs and construction of fish ladders in two weirs; Clean channel and its banks; Elimination of exotics plants, silvicultural treatments and planting of riparian trees and shrubs; and installation of information panels and limitation on use of roads. | The actions of the project are: Recovery of the river mobility space; Recovery of river morphology: recovery of the steepness of the slopes of the channel and the original path of the river (oxbow connection); Recovery of longitudinal continuity: demolition of 5 obsolete weirs and construction of fish ladders in two weirs; Clean channel and its banks; Elimination of exotics plants, silvicultural treatments and planting of riparian trees and shrubs; and installation of information panels and limitation on use of roads. | ||
Line 192: | Line 189: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Revetments with local species, Weir removal, Removal of invasive plants, Creation of fish ladders, | ||
|Floodplain / River corridor=Removal of invasive plants, | |||
|Planform / Channel pattern=Re-instatement of old course, | |||
|Social measures=Information panels for people,New paths near the river, | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 08:32, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Habitat and biodiversity, Social benefits |
Country | Spain |
Main contact forename | CHJ |
Main contact surname | CHJ |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | http://www.chj.es/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In the Serpis River there are a variety of habitats, from riparian forest with undamaged stretches to Mediterranean forest. There are also elements of great cultural and heritage value, as mills from the XIX century. Anthropic pressure, mainly agriculture and hydropower industry makes necessary the restoration to ensure the ecological river corridor.
The actions of the project are: Recovery of the river mobility space; Recovery of river morphology: recovery of the steepness of the slopes of the channel and the original path of the river (oxbow connection); Recovery of longitudinal continuity: demolition of 5 obsolete weirs and construction of fish ladders in two weirs; Clean channel and its banks; Elimination of exotics plants, silvicultural treatments and planting of riparian trees and shrubs; and installation of information panels and limitation on use of roads.
The project has a total budget of 6.912.492€ and is financed by the Ministry of Environment, as part of the National Strategy for River Restoration.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|