Case study:Environmental restoration of the river Zújar: Difference between revisions
No edit summary |
Anna.polazzo (talk | contribs) No edit summary |
||
(15 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=38.98857520000001, -5.72873229999996 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Country= | |||
|Main contact forename=C.H. | |Main contact forename=C.H. | ||
|Main contact surname=Guadiana | |Main contact surname=Guadiana | ||
|Contact organisation=MARM | |||
|Name of parent multi-site project=Case_study:Zújar river restoration in the reach between the ford of "Entrerríos | |||
|Multi-site=Yes | |||
|Contact organisation= | |Project summary=This project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects. | ||
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project. | |||
|Name of parent multi-site project= | |||
| | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 52: | Line 20: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Zújar | ||
}} | }} | ||
{{Site | {{Site | ||
Line 108: | Line 73: | ||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=30000 | ||
|Project started=2011/01/01 | |||
|Total1 cost=16240 | |||
|Funding sources=MARM | |||
|Project started= | |||
|Total1 cost= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
| | |Specific mitigation=Landscape enhancement | ||
|Hydromorphological quality elements=Structure & condition of riparian/lake shore zones, | |||
|Physico-chemical quality elements=Aggregate/mineral extraction | |||
|Other motivation=Recovering longitudinal and transversal connectivity | |||
| | |||
|Physico-chemical quality elements= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Recovery of channel morphology | ||
|Planform / Channel pattern=Protecting and promoting wildlife, Assessment and monitoring program | |||
|Other technical measure=Conditioning of recreational areas | |||
|Planform / Channel pattern= | |||
|Other technical measure= | |||
}} | }} | ||
{{Hydromorphological quality elements header}} | |||
{{End_table}} | {{End_table}} | ||
{{ | {{Biological quality elements header}} | ||
{{End_table}} | {{End_table}} | ||
{{Physico- | {{Physico-chemical quality elements header}} | ||
{{End_table}} | {{End_table}} | ||
{{ | {{Other responses header}} | ||
{{End_table}} | {{End_table}} | ||
{{Monitoring_documents}} | {{Monitoring_documents}} |
Latest revision as of 10:48, 13 February 2014
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | C.H. |
Main contact surname | Guadiana |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. |
Project summary
This project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects.
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|