Case study:Millingerwaard-Floodplain rehabilitation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(5 intermediate revisions by 4 users not shown) | |||
Line 8: | Line 8: | ||
51.8712,6.0044 | 51.8712,6.0044 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=In progress | ||
|Project web site url=www.ruimtevoorderivier.nl/waar-doen-we-dit/projecten/gelderland/uiterwaardvergraving-millingerwaard/ | |||
|Themes=Habitat and biodiversity, Monitoring, Water quality | |||
|Country=Netherlands | |||
|Project web site url= | |Main contact forename=Rene | ||
|Main contact surname=Tank | |||
|Themes= | |Contact organisation=Dienst Landelijk Gebied | ||
|Partner organisations=Rijkswaterstaat, | |||
|Country= | |Name of parent multi-site project=Case_study:Room for the River | ||
|Multi-site=No | |||
|Main contact forename= | |Project summary=This project lowers the waterlevels of the river Waal during high water events with 9 cm. This is achieved by lowering the ground surface level of the river foreland, and by digging new gullies, which will also create more natural conditions. As a result, a river dunes landscape interspersed with forest will (re)emerge. | ||
|Main contact surname= | Also see the infographic on http://issuu.com/ruimtevoorderivier/docs/uiterwaardvergraving_millingerwaard (Dutch) | ||
|Contact organisation | |||
|Partner organisations= | |||
|Name of parent multi-site project= | |||
| | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 185: | Line 170: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling, | ||
|Floodplain / River corridor=Riparian planting,Creation of river dunes, Increase water retention area, | |||
|Floodplain / River corridor= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 233: | Line 204: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.ruimtevoorderivier.nl/meta-navigatie/english/ | |||
|Description=english website | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
Line 259: | Line 232: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 16:02, 2 January 2019
Location: 51° 52' 16.32" N, 6° 0' 15.84" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | http://www.ruimtevoorderivier.nl/waar-doen-we-dit/projecten/gelderland/uiterwaardvergraving-millingerwaard/ |
Themes | Habitat and biodiversity, Monitoring, Water quality |
Country | Netherlands |
Main contact forename | Rene |
Main contact surname | Tank |
Main contact user ID | |
Contact organisation | Dienst Landelijk Gebied |
Contact organisation web site | |
Partner organisations | Rijkswaterstaat |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
This project lowers the waterlevels of the river Waal during high water events with 9 cm. This is achieved by lowering the ground surface level of the river foreland, and by digging new gullies, which will also create more natural conditions. As a result, a river dunes landscape interspersed with forest will (re)emerge.
Also see the infographic on http://issuu.com/ruimtevoorderivier/docs/uiterwaardvergraving_millingerwaard (Dutch)
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beneden-Leeuwen-Side channel, Buiten Ooij, Opijnen- Side channel
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|