Case study:Buiten Ooij: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 18: | Line 18: | ||
|Multi-site=No | |Multi-site=No | ||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 74: | Line 78: | ||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=110 m | ||
|Project started=2008/01/01 | |||
|Works started=2008/01/01 | |||
|Works completed=2009/01/01 | |||
|Project started= | |Total cost category=1 - 10 k€ | ||
|Investigation and design Lead organisation=Staatsbosbeheer | |||
|Works started= | |Stakeholder engagement Lead organisation=Staatsbosbeheer | ||
|Post-project management and maintenance Lead organisation=Staatsbosbeheer | |||
|Works completed= | |Monitoring Lead organisation=Staatsbosbeheer | ||
|Total cost category= | |||
|Investigation and design Lead organisation= | |||
|Stakeholder engagement Lead organisation= | |||
|Post-project management and maintenance Lead organisation= | |||
|Monitoring Lead organisation= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Specific mitigation=agriculture; Depletion of Macrophytes communities | ||
|Hydromorphological quality elements=Quantity & dynamics of flow,Flow velocities,Width & depth variation,Continuity for organisms | |||
|Biological quality elements=Macrophytes,Invertebrates,Fish: Species composition,Fish: Abundance | |||
|Physico-chemical quality elements=Nutrient concentrations,Oxygen balance | |||
|Biological quality elements= | |Other motivation=Landscape enhancement | ||
|Physico-chemical quality elements= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Water release into floodplain in winter,Closing of sluice in summer,Future floodplain lowering | |||
|Planform / Channel pattern=Creation of side channel, | |||
|Management interventions=more natural reservoir releases | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Management interventions= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 281: | Line 204: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 307: | Line 228: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 14:59, 1 November 2023
Location: 51° 51' 32.40" N, 5° 53' 42.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity, Monitoring, Water quality |
Country | Netherlands |
Main contact forename | Gerrit |
Main contact surname | Van Scherrenburg |
Main contact user ID | |
Contact organisation | Staatsbosbeheer |
Contact organisation web site | http://www.staatsbosbeheer.nl/english.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beneden-Leeuwen-Side channel, Millingerwaard-Floodplain rehabilitation, Opijnen- Side channel
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|