Case study:Rheinfelden bypass: Difference between revisions
No edit summary |
No edit summary |
||
(12 intermediate revisions by 3 users not shown) | |||
Line 8: | Line 8: | ||
|Status=Complete | |Status=Complete | ||
|Themes=Economic aspects, Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology | |Themes=Economic aspects, Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology | ||
|Country=Switzerland | |Country=Germany, Switzerland | ||
|Main contact forename=Walter | |Main contact forename=Walter | ||
|Main contact surname=Binder | |Main contact surname=Binder | ||
|Main contact id=Kasvio | |Main contact id=Kasvio | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture= | |Project picture=IMG 7132.JPG | ||
|Picture description=The largest bypass for fish in Europe. The bypass is constructed as nature-like | |Picture description=The largest bypass for fish in Europe. The bypass is constructed as nature-like | ||
|Project summary=The bypassing water course at the hydropower plant Rheinfelden, on the High Rhine, is the largest fish pass facilitiy of this type in Central Europe. The old hydropower station was a diversion-channel type plant. The new station is a run-of-river power plant. Three fishways are installed, a vertical slot pass at the power house (left bank), the new bypassing river course installed in the old headrace channel | |Project summary=The bypassing water course at the hydropower plant Rheinfelden, on the High Rhine, is the largest fish pass facilitiy of this type in Central Europe. The old hydropower station was a diversion-channel type plant. The new station is a run-of-river power plant. Three fishways are installed, a vertical slot pass at the power house (left bank), the new bypassing river course installed in the old headrace channel(right bank) and a rock cascade pass which connect the tailwater of the weir with the river course. | ||
(right bank) and a rock cascade pass which connect the tailwater of the weir with the river course. | |||
The main intention of this new river course is to provide suitable habitat for rheophilic species, especially spawning grounds for gravel dependent fish species, for example barbel (Barbus barbus) and nase | The main intention of this new river course is to provide suitable habitat for rheophilic species, especially spawning grounds for gravel dependent fish species, for example barbel (''Barbus barbus'') and nase(''Chondrostoma nasus''). | ||
(Chondrostoma nasus). | |||
With a width of 40-50 m, a mean gradient of 0.9 % and a discharge of up to 35 m³s-1 the bypass channel has the character of a mountain river. The mean discharge is 16 m3/s and the attraction flow is 15 m3/s. | With a width of 40-50 m, a mean gradient of 0.9 % and a discharge of up to 35 m³s-1 the bypass channel has the character of a mountain river. The mean discharge is 16 m3/s and the attraction flow is 15 m3/s. | ||
The aim is to provide a high variety of bottom and flow structures induced by sequences of riffles, bars, pools and single gravel islands. The bed material consists of continuous gravel. In riffles and fast flowing reaches coarser material is provided. A deeper flow path ensures fish passage even at minor discharges. The river banks are characterized by bars, shallow regions, small bays, undercut banks and riparian vegetation. The bypass channel is connected to the weir impoundment with a gentle transition involving several braided channels. The intake structure itself is divided into two sections. One section will be controlled by two gates, the other will be unregulated. The unregulated section will guarantee a constant discharge of 10 m³s-1 in the bypass channel. Additional discharge up to 25 m³s-1 can be provided via the regulated gates in order to provide a dynamic flow regime. | The aim is to provide a high variety of bottom and flow structures induced by sequences of riffles, bars, pools and single gravel islands. The bed material consists of continuous gravel. In riffles and fast flowing reaches coarser material is provided. A deeper flow path ensures fish passage even at minor discharges. The river banks are characterized by bars, shallow regions, small bays, undercut banks and riparian vegetation. The bypass channel is connected to the weir impoundment with a gentle transition involving several braided channels. The intake structure itself is divided into two sections. One section will be controlled by two gates, the other will be unregulated. The unregulated section will guarantee a constant discharge of 10 m³s-1 in the bypass channel. Additional discharge up to 25 m³s-1 can be provided via the regulated gates in order to provide a dynamic flow regime. | ||
The downstream entrance is designed as a rock ramp with a steeper gradient (3 %), thus downstream water-level fluctuations are limited to this ramp; i.e. flow characteristics in potential spawning grounds in the bypass channel will not change. The cross-section at the mouth of the channel is narrowed to provide more efficient attraction flow into the tailrace. | |||
The downstream entrance is designed as a rock ramp with a steeper gradient (3%), thus downstream water-level fluctuations are limited to this ramp; i.e. flow characteristics in potential spawning grounds in the bypass channel will not change. The cross-section at the mouth of the channel is narrowed to provide more efficient attraction flow into the tailrace. | |||
The total cost of the project was 6 milj. € and the by-pass channel cost 4 milj. €. There is no constant monitoring yet, but they have calculated the amount of the fish in the by-pass channel to be 30 000. In the other fish way the number of fish was 3 000. | The total cost of the project was 6 milj. € and the by-pass channel cost 4 milj. €. There is no constant monitoring yet, but they have calculated the amount of the fish in the by-pass channel to be 30 000. In the other fish way the number of fish was 3 000. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Rheinfelden map.JPG | |||
|Caption=The map of Rheinfelden bypass. New power plant designed as run-of-river type. Near-nature water course installed in the old headrace channel. (photo: Walter Binder) | |||
}} | |||
{{Case study image | |||
|File name=Rheinfelden fishcounter2.JPG | |||
|Caption=Fish counter at the end of Rheinfelden bypass (photo: Pinja Kasvio) | |||
}} | |||
{{Case study image | |||
|File name=Rheinfelden hydpropowerplant2.JPG | |||
|Caption=Hydropowerplant (photo Pinja Kasvio) | |||
}} | |||
{{Case study image | |||
|File name=Fish path rheinfelden2.jpg | |||
|Caption=Pool fish pass (photo: Pinja Kasvio) | |||
}} | |||
{{Case study image | |||
|File name=Technical fish pass.jpg | |||
|Caption=Technical fish pass (photo Pinja Kasvio) | |||
}} | |||
{{Case study image | |||
|File name=Rheinfelden natural fishway.JPG | |||
|Caption=Nature-like bypass channel for fish (photo Pinja Kasvio). | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site | {{Site | ||
|Name=River Rhine at Rheinfelden | |||
|Heavily modified water body=No | |Heavily modified water body=No | ||
|Protected species present=No | |Protected species present=No | ||
|Invasive species present=No | |Invasive species present=No | ||
|Species=Barbel (Barbus barbus), nase (Chondrostoma nasus), | |Species=Barbel (Barbus barbus), nase (Chondrostoma nasus), | ||
|Dominant hydrology=Artificially regulated, Environmental flow | |Dominant hydrology=Artificially regulated, Environmental flow | ||
|Dominant substrate=Gravel, | |Dominant substrate=Gravel, | ||
|River corridor land use=Urban, Coniferous woodland (semi natural), | |River corridor land use=Urban, Coniferous woodland (semi natural), | ||
|Average bankfull channel width category=10 - 50 m | |Average bankfull channel width category=10 - 50 m | ||
|Avrg bankfull channel width=40-50 | |Avrg bankfull channel width=40-50 | ||
Line 41: | Line 71: | ||
}} | }} | ||
{{Project background | {{Project background | ||
|Total1 cost=10 | |Total cost category=5000 - 10000 k€ | ||
|Total1 cost=10,000 | |||
}} | }} | ||
{{Motivations}} | {{Motivations}} | ||
Line 63: | Line 94: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{ | {{Additional Documents}} | ||
{{Case study | {{Case study documents | ||
|File name= | |File name=DSCN2254.MOV | ||
| | |Description=new bypass channel | ||
}} | }} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 09:59, 9 December 2013
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology |
Country | Germany, Switzerland |
Main contact forename | Walter |
Main contact surname | Binder |
Main contact user ID | User:Kasvio |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The bypassing water course at the hydropower plant Rheinfelden, on the High Rhine, is the largest fish pass facilitiy of this type in Central Europe. The old hydropower station was a diversion-channel type plant. The new station is a run-of-river power plant. Three fishways are installed, a vertical slot pass at the power house (left bank), the new bypassing river course installed in the old headrace channel(right bank) and a rock cascade pass which connect the tailwater of the weir with the river course.
The main intention of this new river course is to provide suitable habitat for rheophilic species, especially spawning grounds for gravel dependent fish species, for example barbel (Barbus barbus) and nase(Chondrostoma nasus).
With a width of 40-50 m, a mean gradient of 0.9 % and a discharge of up to 35 m³s-1 the bypass channel has the character of a mountain river. The mean discharge is 16 m3/s and the attraction flow is 15 m3/s.
The aim is to provide a high variety of bottom and flow structures induced by sequences of riffles, bars, pools and single gravel islands. The bed material consists of continuous gravel. In riffles and fast flowing reaches coarser material is provided. A deeper flow path ensures fish passage even at minor discharges. The river banks are characterized by bars, shallow regions, small bays, undercut banks and riparian vegetation. The bypass channel is connected to the weir impoundment with a gentle transition involving several braided channels. The intake structure itself is divided into two sections. One section will be controlled by two gates, the other will be unregulated. The unregulated section will guarantee a constant discharge of 10 m³s-1 in the bypass channel. Additional discharge up to 25 m³s-1 can be provided via the regulated gates in order to provide a dynamic flow regime.
The downstream entrance is designed as a rock ramp with a steeper gradient (3%), thus downstream water-level fluctuations are limited to this ramp; i.e. flow characteristics in potential spawning grounds in the bypass channel will not change. The cross-section at the mouth of the channel is narrowed to provide more efficient attraction flow into the tailrace.
The total cost of the project was 6 milj. € and the by-pass channel cost 4 milj. €. There is no constant monitoring yet, but they have calculated the amount of the fish in the by-pass channel to be 30 000. In the other fish way the number of fish was 3 000.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|