Case study:Room for the River: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(7 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url=www.ruimtevoorderivier.nl/meta-navigatie/english/ | |||
|Themes=Habitat and biodiversity, Water quality | |Themes=Habitat and biodiversity, Water quality | ||
|Country=Netherlands | |Country=Netherlands | ||
Line 17: | Line 13: | ||
|Main contact surname=Blankvoort | |Main contact surname=Blankvoort | ||
|Contact organisation=Rijkswaterstaat Oost-Nederland | |Contact organisation=Rijkswaterstaat Oost-Nederland | ||
|Partner organisations=Dienst Landelijk Gebied, | |||
|Multi-site=Yes | |Multi-site=Yes | ||
|Project picture=Room for the River.png | |Project picture=Room for the River.png | ||
|Picture description=Map of the Room for the River sites, the Netherlands | |Picture description=Map of the Room for the River sites, the Netherlands | ||
|Project summary=The goal of the Dutch Room for the River Programme is to give the river more room to be able to manage higher water levels. At more than 30 locations, measures will be taken that give the river space to flood safely. Moreover, the measures will be designed in such a way that they improve the quality of the immediate surroundings. The Room for the River programme will be completed by approximately 2015. | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 77: | Line 80: | ||
}} | }} | ||
{{ | {{Project background | ||
|Project started=2003/01/01 | |||
|Works completed=2008/01/01 | |||
|Project completed=2015/12/31 | |||
|Total cost category=more than 10000 k€ | |||
|Project started= | |Investigation and design Lead organisation=Rijkswaterstaat Oost-Nederland | ||
|Stakeholder engagement Lead organisation=Rijkswaterstaat Oost-Nederland | |||
|Works and supervision Lead organisation=Rijkswaterstaat Oost-Nederland | |||
|Post-project management and maintenance Lead organisation=Rijkswaterstaat Oost-Nederland | |||
|Works completed= | |||
|Project completed= | |||
|Total cost category= | |||
|Investigation and design Lead organisation= | |||
|Stakeholder engagement Lead organisation= | |||
|Works and supervision Lead organisation= | |||
|Post-project management and maintenance Lead organisation= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Specific mitigation=Agriculture, Urbanisation, | ||
|Hydromorphological quality elements=Connection to groundwaters,Channel pattern/planform,Quantity & dynamics of flow | |||
|Other motivation=Landscape enhancement | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
Line 270: | Line 202: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 278: | Line 209: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 14:35, 21 June 2021
Location: 52° 22' 31.80" N, 5° 37' 30.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ruimtevoorderivier.nl/meta-navigatie/english/ |
Themes | Habitat and biodiversity, Water quality |
Country | Netherlands |
Main contact forename | Rutger |
Main contact surname | Blankvoort |
Main contact user ID | |
Contact organisation | Rijkswaterstaat Oost-Nederland |
Contact organisation web site | |
Partner organisations | Dienst Landelijk Gebied |
This is a parent project encompassing the following projects |
Millingerwaard-Floodplain rehabilitation, Ontpoldering Noordwaard, Uiterwaardvergraving Keizers- en Stobbenwaarden en Olsterwaarden |
Project summary
Edit project overview to modify the project summary.
The goal of the Dutch Room for the River Programme is to give the river more room to be able to manage higher water levels. At more than 30 locations, measures will be taken that give the river space to flood safely. Moreover, the measures will be designed in such a way that they improve the quality of the immediate surroundings. The Room for the River programme will be completed by approximately 2015.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Amerongse Bovenpolder, Bakenhof Dyke reconstruction, Blauwe Kamer, Ruppoldingen, Upper Main catchment restoration
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|