|Project summary=Dam was removed in the River Stenån to help the trout and other fish to migrate upwards the stream. Also other measures to impove fish migration and reproduction has been made by biotope improvements. Wood depris and rocks and gravel has been added to stream bed. | |||
Also the stream and lakee in the Stenån water system are acidified and limed since 1986. | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} |
Revision as of 12:13, 29 April 2013
This case study is pending approval by a RiverWiki administrator.
Location: 57° 8' 43.61" N, 12° 29' 31.94" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity |
Country | Sweden |
Main contact forename | Katarina |
Main contact surname | Vartia |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
Dam was removed in the River Stenån to help the trout and other fish to migrate upwards the stream. Also other measures to impove fish migration and reproduction has been made by biotope improvements. Wood depris and rocks and gravel has been added to stream bed.
Also the stream and lakee in the Stenån water system are acidified and limed since 1986.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | Stenån-Hovgårds kvarn |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | River Stenån |
Pre-project morphology | Embanked |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | Natura 2000 |
Protected species present | Yes |
Invasive species present | No |
Species of interest | The freshwater pearl mussel, Salmon |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable), Woodland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information