Case study:Kleine Aa, traject Smalwater Noord: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 27: Line 27:
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site
{{Site
|Name=Kleine Aa, traject Smalwater Noord
|WFD (national) typology=R5
|WFD (national) typology=R5
|Pre-project morphology=Single channel,  
|Pre-project morphology=Single channel,
|Heavily modified water body=Yes
|Heavily modified water body=Yes
|Protected species present=No
|Protected species present=No
|Invasive species present=No
|Invasive species present=No
|Dominant substrate=sand
|Dominant substrate=sand
|River corridor land use=Improved/semi-improved grassland/pasture, Intensive agriculture (arable),  
|River corridor land use=Improved/semi-improved grassland/pasture, Intensive agriculture (arable),
|Average bankfull channel width category=5 - 10 m
|Average bankfull channel width category=5 - 10 m
|Avrg bankfull channel width=7.7
|Avrg bankfull channel width=7.7

Revision as of 15:46, 11 April 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 35' 42.36" N, 5° 16' 35.87" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://http://www.esschestroom.nl/index.php?pid=7&info=7
Themes Habitat and biodiversity, Spatial planning
Country Netherlands
Main contact forename Rogier
Main contact surname Vogelij
Main contact user ID
Contact organisation Dienst Landelijk Gebied
Contact organisation web site http://www.dienstlandelijkgebied.nl/en
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Waterboard De Dommel in cooperation with Foundation Brabants Landschap (Brabant Landscape) have restored the watercourse Kleine Aa (Small Aa) to improve landscape and ecological values.

The southern portion of this stream was restored some years ago, and in September 2011 the northern part, the area between the railway Boxtel - Tilburg and the outlet in the Essche Stream, was restored. At the moment the project Kleine Aa in the final stages of completion as the second fish passage is contstructed downstream. The work will probably be completed by summer 2013.

Between Kapelweg and Helweg in Boxtel, the stream is restored over a length of 1.5 km. The result is a natural, narrow, brook that winds its way through the landscape. Two fish passage allow fish like the Bitter Roach, Chub and Ide, to swim again between the Essche stroom and the Beerze, at the spot where dams previously prevented this.

The use of rubble in this fishways improves the habitat of protected bullhead. Also amphibians will be more at home in the area thanks to the pools on the banks of the stream. The scenery along the water is varied, with flowery meadows, willows and elms.

A hiking trail now also allows hikers to explore the area, crossing the stream at a location where a crossing was historically.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name Kleine Aa, traject Smalwater Noord
WFD water body codes
WFD (national) typology R5
WFD water body name
Pre-project morphology Single channel
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate sand
River corridor land use Improved/semi-improved grassland/pasture, Intensive agriculture (arable)
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m) 7.77.7 m <br />0.0077 km <br />770 cm <br />
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m) 1.51.5 m <br />0.0015 km <br />150 cm <br />
Mean discharge category 1 - 10 m³/s
Mean annual discharge (m3/s) 44 m³/s <br />4,000 l/s <br />
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information