Case study:Amerongse Bovenpolder: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 57: | Line 57: | ||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=Management plan Amerongse Bovenpolder.pdf | |||
|Description=The management plan 2011-2021 for the Amerongse Bovenpolder and the Amerongs bos | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} |
Revision as of 17:10, 27 March 2013
This case study is pending approval by a RiverWiki administrator.
Location: 51° 59' 40.39" N, 5° 28' 15.67" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | Netherlands |
Main contact forename | Wim |
Main contact surname | Zeeman |
Main contact user ID | |
Contact organisation | Dienst Landelijk Gebied |
Contact organisation web site | http://www.dienstlandelijkgebied.nl/en |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Rhine |
---|---|
River basin | Rhine |
Subcatchment
River name | Rhine |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 1000 - 2000 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Central Plains |
Dominant land cover | Grassland, Urban |
Waterbody ID |
Other case studies in this subcatchment: Bakenhof Dyke reconstruction, Blauwe Kamer, Room for the River, Ruppoldingen, Upper Main catchment restoration
Site
Name | Amerongse Bovenpolder |
---|---|
WFD water body codes | |
WFD (national) typology | R7 |
WFD water body name | |
Pre-project morphology | Plane bed |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | oyster catchers, Plover (Charadrius sp.), common redshank, Black-tailed Godwit, Common Snipe |
Dominant hydrology | |
Dominant substrate | Clay |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | 170170 m <br />0.17 km <br />17,000 cm <br /> |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | 100 - 1000 m³/s |
Mean annual discharge (m3/s) | 500500 m³/s <br />500,000 l/s <br /> |
Average channel gradient category | Less than 0.001 |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 14001,400 m <br />1.4 km <br />140,000 cm <br /> |
---|---|
Project started | 2001/01/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Rijkswaterstaat, Dienst Landelijk Gebied |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information