Case study:Skjern River Project: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 40: | Line 40: | ||
{{Case study image | {{Case study image | ||
|File name=Demolishing pumping station .jpg | |File name=Demolishing pumping station .jpg | ||
|Caption=Removal of an old pumping station | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Bulldozing new river.jpg | |File name=Bulldozing new river.jpg | ||
|Caption=Bulldozing of the new river course | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Excavators skjern river.jpg | |File name=Excavators skjern river.jpg | ||
|Caption=Excavation of the new river course | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Skjern river during restoration.jpg | |File name=Skjern river during restoration.jpg | ||
|Caption=Overall view of the Skjern river during restoration | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Skjern | |File name=Skjern River after restoration.jpg | ||
|Caption=Overall view of the Skjern river after restoration | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=New wetland.jpg | |File name=New wetland.jpg | ||
|Caption=The new wetland | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name= | |File name=Flooding of the Skjern River following restoration.jpg | ||
|Caption=Air photograph of the Skjern during flooding | |||
}} | }} | ||
{{Image gallery end}} | {{Image gallery end}} |
Revision as of 13:30, 13 February 2013
This case study is pending approval by a RiverWiki administrator.
Location: 55° 54' 13.10" N, 8° 26' 25.42" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Social benefits |
Country | Denmark |
Main contact forename | Niels Dahlin |
Main contact surname | Lisborg |
Main contact user ID | |
Contact organisation | The National Forest and Nature Agency (Denmark) |
Contact organisation web site | http://www.naturstyrelsen.dk/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | 2004/12/31 |
Total cost category | |
Total cost (k€) | 37926811.0037,926,811 k€ <br />37,926,811,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Excavation of the new river course, removal of existing dikes, the filling of the old channelized river reaches, removal of an old pumping station and a weir, construction of bridges, paths and car park. |
Floodplain / River corridor | |
Planform / Channel pattern | Construction of new bridges, Correct the morphology of the bed., Creation of active side channel |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information