Case study:Beneden-Leeuwen-Side channel: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(XML import)
 
No edit summary
Line 13: Line 13:
       51.8885,5.52809
       51.8885,5.52809
}}
}}
{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Themes=Habitat and biodiversity, Monitoring, Water quality
   
|Country=Netherlands
      Complete
|Main contact forename=Rogier
|Project web site url=
|Main contact surname=Vogelij
     
|Contact organisation=Rijkswaterstaat
|Themes=
|Multi-site=No
      Habitat and biodiversity,Water quality,Monitoring
|Country=
      Netherlands
|Main contact forename=
     
|Main contact surname=
     
|Main contact id=
     
|Contact organisation=
      Rijkswaterstaat
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Case_study_subcatchment

Revision as of 10:04, 28 January 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 53' 18.60" N, 5° 31' 41.12" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Monitoring, Water quality
Country Netherlands
Main contact forename Rogier
Main contact surname Vogelij
Main contact user ID
Contact organisation Rijkswaterstaat
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Rhine
River basin Millingerwaard

Subcatchment

River name Waal
Area category more than 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Calcareous
Ecoregion Central Plains
Dominant land cover Extensive agriculture, Urban
Waterbody ID



Other case studies in this subcatchment: Buiten Ooij, Millingerwaard-Floodplain rehabilitation, Opijnen- Side channel


Site

Edit site
Name Beneden-Leeuwen
WFD water body codes
WFD (national) typology R7
WFD water body name
Pre-project morphology Single channel, Straight, Sinuous, High width:depth
Reference morphology Single channel, Revetments
Desired post project morphology
Heavily modified water body true
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Sand, Clay
River corridor land use Urban, Extensive agriculture
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started 1994/01/01
Works started 1994/01/01
Works completed 1997/01/01
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Quantity & dynamics of flow, Continuity for organisms
Biology Macrophytes, Invertebrates, Fish: Age structure
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Edit Measures
Structural measures
Bank/bed modifications Re-grading of banks
Floodplain / River corridor
Planform / Channel pattern Backwater created, Side channel created
Other
Non-structural measures
Management interventions More natural water retention
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Macrophytes Yes Yes Yes Improvement
Invertebrates Yes Yes Yes Improvement
Fish: Age structure Yes Yes Yes Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information