Line 41: | Line 41: | ||
}} | }} | ||
{{Project background | {{Project background | ||
|Project started= | |Reach length directly affected=500 | ||
|Project started=2006/01/01 | |||
|Works started=2007/09/02 | |||
|Project completed=2010/12/31 | |||
|Total cost category=50 - 100 k€ | |||
|Total1 cost=100 | |||
|Funding sources=Centre for Economic Development, Transport and the Environment for Uusimaa,SYKE | |Funding sources=Centre for Economic Development, Transport and the Environment for Uusimaa,SYKE | ||
|Investigation and design Lead organisation=Centre for Economic Development, Transport and the Environment fo Uusimaa | |Investigation and design Lead organisation=Centre for Economic Development, Transport and the Environment fo Uusimaa | ||
}} | }} |
Revision as of 13:32, 20 December 2012
This case study is pending approval by a RiverWiki administrator.
Location: 60° 12' 59.21" N, 24° 14' 42.69" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx |
Themes | Fisheries, Habitat and biodiversity |
Country | Finland |
Main contact forename | Esa |
Main contact surname | Lehtinen |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for Uusimaa |
Contact organisation web site | http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Siuntionjoki River Basin |
---|---|
River basin |
Subcatchment
River name | Siuntionjoki River |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | 230 km²23,000 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | |
Waterbody ID |
Site
Name | Sågarsfors dam |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Ponded |
Reference morphology | Artificial channel |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | No |
Species of interest | Sea trout (Salmo trutta), freshwater pearl mussel (Margaritifera margaritifera) |
Dominant hydrology | Artificially regulated |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | 1 - 10 m³/s |
Mean annual discharge (m3/s) | 2,8",8" is not declared as a valid unit of measurement for this property. |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 500500 m <br />0.5 km <br />50,000 cm <br /> |
---|---|
Project started | 2006/01/01 |
Works started | 2007/09/02 |
Works completed | |
Project completed | 2010/12/31 |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 100100 k€ <br />100,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Centre for Economic Development, Transport and the Environment for Uusimaa, SYKE |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Centre for Economic Development, Transport and the Environment fo Uusimaa | ||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building fishway, Introducing gravel, Building of submerged weirs and pits, Introducing stones |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|