Case study:Restoration of Kostonjoki River: Difference between revisions
No edit summary |
No edit summary |
||
Line 42: | Line 42: | ||
{{Case study image | {{Case study image | ||
|File name=Restoration of Kostonjoki River Koitikoski torrent after restoration.JPG | |File name=Restoration of Kostonjoki River Koitikoski torrent after restoration.JPG | ||
|Caption=Restoration of Kostonjoki River_Koitikoski torrent after restoration | |Caption=Restoration of Kostonjoki River_Koitikoski torrent after restoration (photo.Eero Hiltunen) | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Restoration of Kostonjoki River Kutinkoski torrent after restoration.jpg | |File name=Restoration of Kostonjoki River Kutinkoski torrent after restoration.jpg | ||
|Caption=Restoration of Kostonjoki River_Kutinkoski torrent after restoration | |Caption=Restoration of Kostonjoki River_Kutinkoski torrent after restoration (photo.Eero Hiltunen) | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=Restoration of Kostonjoki River Kutinkoski torrent before restoration.JPG | |File name=Restoration of Kostonjoki River Kutinkoski torrent before restoration.JPG | ||
|Caption=Restoration of Kostonjoki River_Kutinkoski torrent before restoration | |Caption=Restoration of Kostonjoki River_Kutinkoski torrent before restoration (photo.Eero Hiltunen) | ||
}} | }} | ||
{{Case study image | {{Case study image |
Revision as of 14:01, 18 December 2012
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Fisheries, Habitat and biodiversity, Social benefits |
Country | Finland |
Main contact forename | Jukka |
Main contact surname | Tuohino |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for North Ostrobothnia |
Contact organisation web site | http://www.ymparisto.fi/default.asp?node=27306&lan=fi |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
Kostonjoki River is one of the tributaries of the River Iijoki. The River Kostonjoki was dredged for timber floating like many other tributaries of the River Iijoki. Before dredging in 1956-1958 there were 105 hectares of rapids and riffles in the Kostonjoki River. After dredging most of the riffles and rapids were destroyed and habitats of the migrating fish lost. Restorations of the Kostonjoki River took place in 2005-2012 as the aim of setting the condition of the water system closer to it´s natural state to enable the fish migration. Object of the restorations was to create pool-riffle variation, add natural water levels to rewater dried parts of the river and add stones and gravel to create habitats for migrating fish. Restorations were successful. Rapid and riffle areas of the Kostonjoki River grew 60% after restorations and densities of migrating fish increased.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | The Kostonjoki River |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Straightened, Over-widened |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | Trouts, European grayling, crabs, mussels |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information