Case study:Restoration of Naarkoski Torrent: Difference between revisions
No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Restoration of Naarkoski Torrent bypass.jpg | |Project picture=Restoration of Naarkoski Torrent bypass.jpg | ||
|Picture description=Naarkoski Torrent after restoration | |Picture description=Naarkoski Torrent after restoration | ||
|Project summary=Naarkoski torrent in the River Porvoonjoki is situated near the Pukkila city center. A fishway was constructed to enable the migrating fish to pass the Naarkoski power plant and open the way for fish to the upper reaches of the stream. Constructions of the bypass channel was started in October 2002 and finished in june 2003. Project was executed and managed in co-operation with the municipality of Pukkila and and Environmental Institute for Uusimaa. Cost of the restoration was 160 000 euros and it was financed by municipality of Pukkila, Environment Centre for Uusimaa and European Regional Development Fund, among the others. | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 12:38, 4 December 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Finland |
Main contact forename | Kari |
Main contact surname | Rantakokko |
Main contact user ID | |
Contact organisation | SYKE |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Naarkoski torrent in the River Porvoonjoki is situated near the Pukkila city center. A fishway was constructed to enable the migrating fish to pass the Naarkoski power plant and open the way for fish to the upper reaches of the stream. Constructions of the bypass channel was started in October 2002 and finished in june 2003. Project was executed and managed in co-operation with the municipality of Pukkila and and Environmental Institute for Uusimaa. Cost of the restoration was 160 000 euros and it was financed by municipality of Pukkila, Environment Centre for Uusimaa and European Regional Development Fund, among the others.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Porvoonjoki River Basin |
---|---|
River basin |
Subcatchment
River name | Naarkoski Torrent |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Naarkoski Torrent-fishway |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Ponded |
Reference morphology | Step-pool |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2002/01/01 |
Works started | |
Works completed | 2003/01/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 160 k€160,000 € <br /> |
Benefit to cost ratio | |
Funding sources | SYKE, European Regional Development Fund (ERDF), Municipality of Pukkila, Regional ELY-centre, Uusimaa Regional Council |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building fishway, Introducing gravel, Building of submerged weirs and pits, Introducing stones |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|