Case study:Brook Ramlösa-Restoration of agricultural stream: Difference between revisions
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
|Protected species present=No | |Protected species present=No | ||
|Invasive species present=No | |Invasive species present=No | ||
|River corridor land use=Intensive agriculture (arable), | |River corridor land use=Intensive agriculture (arable), | ||
}} | }} | ||
{{Project background}} | {{Project background}} |
Revision as of 10:05, 30 November 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Flood risk management, Habitat and biodiversity |
Country | Sweden |
Main contact forename | Claes |
Main contact surname | Nihlen |
Main contact user ID | |
Contact organisation | Municipality of Helsingborg |
Contact organisation web site | http://www.lansstyrelsen.se/skane/Sv/djur-och-natur/skyddad-natur/ovriga skyddsformer/nationellt-vardefulla-vatten/vattenbeskrivning/Pages/Raan.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Ramlösa brook is tributary of River Råån and it´s situated in Southern part of Sweden in the city of Helsingborg. The drainage area of the brook is mostly agricultural, cultivated land. Before restoration the brook had few serious problems which caused flooding problems and rinse of sediment and nutrients from the fields. The brook was very deep and slope of the bank steep which caused serious erosion problems. To prevent the flooding and erosion two-stage drainage channel was constructed. The object was to stabilize the stream by decreasind the slope of the banks, creating riparian zones and increasing meandering in the stream. Also stones and gravel were added in the bed of the stream to create more natural habitat for fish and other aquatic organisms. The restoration took place in 2002 and it was managed by the municipality of Helsingborg.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Ramlösa Brook |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information