Case study:Restoration of Kalajoki River: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Country=Finland | |Country=Finland | ||
|Main contact forename= | |Main contact forename=Eero | ||
|Main contact surname= | |Main contact surname=LAUKKANEN | ||
|Main contact id=eero.laukkanen@vyh.fi | |||
|Contact organisation=Centre for Economic Development, Transport and the Environment for North Ostrobothnia | |Contact organisation=Centre for Economic Development, Transport and the Environment for North Ostrobothnia | ||
|Contact organisation url=www.kalajoki.fi/ymparisto/rahjansaaristo | |||
|Partner organisations=• Pohjois−Pohjanmaan ympäristökeskus; • Metsähallitus. | |||
|Multi-site=No | |Multi-site=No | ||
}} | }} |
Revision as of 10:31, 19 November 2012
This case study is pending approval by a RiverWiki administrator.
Location: 64° 15' 21.76" N, 23° 56' 36.51" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Finland |
Main contact forename | Eero |
Main contact surname | LAUKKANEN |
Main contact user ID | User:eero.laukkanen@vyh.fi |
Contact organisation | Centre for Economic Development, Transport and the Environment for North Ostrobothnia |
Contact organisation web site | http://www.kalajoki.fi/ymparisto/rahjansaaristo |
Partner organisations | • Pohjois−Pohjanmaan ympäristökeskus; • Metsähallitus. |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | Kalajoki River Basin |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | crayfish, lamprey, different fish species |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Coniferous woodland (semi natural) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 1994 |
Works started | |
Works completed | |
Project completed | 2004/09/02 |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information