|Picture description=Following realignment of the dyke
|Project summary=Dike realignment took place utilising an area of former brickwork factory. The floodplain was widened by 200 meters and a new secondary channel created.  The works also improved habitat connections, by increasing vegetation in the floodplain which will mature over time. The site is now popular for recreation, specifically for water sports, with Arnhem residents.  
|Project summary=Dike realignment took place utilising an area of former brickwork factory. The floodplain was widened by 200 meters and a new secondary channel created.  The works also improved habitat connections, by increasing vegetation in the floodplain which will mature over time. The site is now popular for recreation, specifically for water sports, with Arnhem residents.  
The channel capacity has increased to allow for significant changes in flow. There has been little effect on biological quality with regard to Water Framework Directive targets, as fish and benthic invertebrates were not monitored before the works were carried out.
The channel capacity has increased to allow for significant changes in flow. There has been little effect on biological quality with regard to Water Framework Directive targets, as fish and benthic invertebrates were not monitored before the works were carried out.

Revision as of 09:45, 19 November 2012

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 58' 0.73" N, 5° 55' 37.43" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity
Country Netherlands
Main contact forename Nick
Main contact surname Elbourne
Main contact user ID User:NickRRC
Contact organisation River Restoration Centre
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Following realignment of the dyke

Project summary

Edit project overview to modify the project summary.


Dike realignment took place utilising an area of former brickwork factory. The floodplain was widened by 200 meters and a new secondary channel created. The works also improved habitat connections, by increasing vegetation in the floodplain which will mature over time. The site is now popular for recreation, specifically for water sports, with Arnhem residents. The channel capacity has increased to allow for significant changes in flow. There has been little effect on biological quality with regard to Water Framework Directive targets, as fish and benthic invertebrates were not monitored before the works were carried out.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Rhine
River basin Rhine

Subcatchment

River name Rhine
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 1000 - 2000 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Plains
Dominant land cover Grassland, Urban
Waterbody ID



Other case studies in this subcatchment: Amerongse Bovenpolder, Blauwe Kamer, Room for the River, Ruppoldingen, Upper Main catchment restoration


Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information