Case study:Vindel River LIFE: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 338: Line 338:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image gallery}}
{{Case study image
|File name=NVindel River Lifen Lidsbacken before restoration.jpg
|Caption=nVindel River Lifen Lidsbacken_before restoration
}}
{{Image_gallery_end}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}

Revision as of 07:54, 19 November 2012

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 64° 56' 55.79" N, 18° 5' 39.66" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://vindelriverlife.se/
Themes Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology, Water quality
Country Sweden
Main contact forename Johanna
Main contact surname Gardeström
Main contact user ID
Contact organisation Umeå University
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
Vindel River LIFE
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Vindel River LIFE is a collaborative project between Umeå University, Vindel River Fishery Advisory Board, and the Swedish University of Agricultural Sciences. The aim of the project is to reduce the effects of fragmentation and channelization in the Vindel River catchment by removing former timber-floating installations. Restoration of 22 tributaries along a total river stretch of 44 km during 2010 – 2015 means that 73 % of the former installations will be removed. The objective of the project is to achieve a good water status in the river and an increased conservation status for the species in the area.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district
River basin Vindel River Basin

Subcatchment

River name River Vindelälven
Area category more than 10000 km²
Area (km2) 12650 km²1,265,000 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover Woodland
Waterbody ID



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Straight, High width:depth
Reference morphology Braided, Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Gravel, Sand, Cobble
River corridor land use Woodland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started 2010/01/01
Works started 2011/01/01
Works completed 2014/01/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€)
Benefit to cost ratio
Funding sources European Commission, Federal Nature Protection Agency, County Administrative Board, Municipalities, Universities

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Umeå University Johanna Gardeström
Stakeholder engagement and communication Umeå University Johanna Gardeström
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Riparian development
Hydromorphology Width & depth variation, Flow velocities, Substrate conditions
Biology Fish: Disturbance-sensitive species, Invertebrates: Disturbance-sensitive species, Fish: Abundance, Continuity of sediment transport
Physico-chemical Invertebrates: Diversity
Other reasons for the project Landscape enhancement, Bank erosion, Flood risk management


Measures

Edit Measures
Structural measures
Bank/bed modifications Re-introducing stones and large woody debris, Re-introducing stones and gravel, Removal of old dams, Building fishways
Floodplain / River corridor Increases the interaction between land and water and the heterogeneity of the substrate, vegetation and shore structure
Planform / Channel pattern Re-instatement of old course
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flow velocities Yes Awaiting results
Continuity for organisms Awaiting results
Width & depth variation Awaiting results

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Disturbance-sensitive species Yes Awaiting results
Fish: Abundance Awaiting results
Invertebrates: Disturbance-sensitive species Awaiting results

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


nVindel River Lifen Lidsbacken_before restoration


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information