Case study:Ruppoldingen: Difference between revisions
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
}} | }} | ||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Rhine | ||
}} | }} | ||
{{Site | {{Site |
Revision as of 10:49, 15 November 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Hydropower |
Country | Switzerland |
Main contact forename | nick |
Main contact surname | elbourne |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
A natural fish pass was constructed on the river Aar at the Ruppoldingen hydropower plant. The aim was to mitigate the impacts of the hydropower plant, allowing free fish migration and compensate for loss of habitats.
The scheme was two-fold. Firstly a 155 meter long natural fish pass close to the turbines. A second 1.2km long bypass channel was also created further downstream of the plant. This channel comprised two arms, one which was shallower with gravel riffles installed and a deeper channel for migration. The aim was to re-create a natural alpine stream. The mean gradient of the fish pass is 3.8%, and the bypass channel 0.4%.
Pike, Carp, Barbell and Catfish have been seen to use the bypass channel. Juvenile Grayling have also been found, suggesting that the bypass channel is providing a new reproductive area.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Rhine |
---|---|
River basin | Rhine |
Subcatchment
River name | Rhine |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 1000 - 2000 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Central Plains |
Dominant land cover | Grassland, Urban |
Waterbody ID |
Other case studies in this subcatchment: Amerongse Bovenpolder, Bakenhof Dyke reconstruction, Blauwe Kamer, Room for the River, Upper Main catchment restoration
Site
Name | Aar at Ruppoldingen |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | Pool-riffle |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Improved/semi-improved grassland/pasture, Broadleaf/mixed woodland (semi natural) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information