Case study:River Avon Our Water Environment: Difference between revisions
No edit summary |
No edit summary |
||
(39 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 11: | Line 11: | ||
|Main contact forename=Jos | |Main contact forename=Jos | ||
|Main contact surname=Milner | |Main contact surname=Milner | ||
|Contact organisation url= | |Contact organisation=Tomintoul & Glenlivet Landscape Partnership | ||
|Partner organisations=Spey | |Contact organisation url=www.tomintoulandglenlivet.com/our-water-environment/ | ||
|Partner organisations=Spey Fishery Board, Cairngorms National Park Authority, Crown Estate Scotland, Delnabo Estate, Fordmouth Farm | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture= | |Project picture=FordmouthRevetment.jpg | ||
|Picture description=Engineered woody structure along river bank at Fordmouth Farm - soil scrapped back & 8m long tree trunks, with intact root plates towards river, located along bank prior to burying | |Picture description=Engineered woody structure along river bank at Fordmouth Farm - soil scrapped back & 8m long tree trunks, with intact root plates towards river, located along bank prior to burying | ||
|Project summary=River restoration works have been carried out along a high-energy reach of the River Avon within the River Spey Special Area of Conservation (SAC) in Cairngorms National Park. The project encompasses green engineering woody structures and sediment management, as well as water margin management and riparian planting. The aim is to improve the capability of the watercourse to cope with high flow events, reduce excessive erosion and to protect in-channel and riparian habitats, as well as farm livelihoods. The works were carried out as a Scottish Rural Development Programme (SRDP) Agri-Environment Climate Scheme (AECS), supported and managed by a National Lottery Heritage Funded partnership ( | |Project summary=River restoration works have been carried out along a high-energy reach of the River Avon within the River Spey Special Area of Conservation (SAC) in Cairngorms National Park. The project encompasses green engineering woody structures and sediment management, as well as water margin management and riparian planting. The aim is to improve the capability of the watercourse to cope with high flow events, reduce excessive erosion and to protect in-channel and riparian habitats, as well as farm livelihoods and infrastructure. The works were carried out as a Scottish Rural Development Programme (SRDP) Agri-Environment Climate Scheme (AECS), supported and managed by a National Lottery Heritage Funded partnership (Tomintoul & Glenlivet Landscape Partnership) as part of their wider ‘Our Water Environment’ project running across the Tomintoul and Glenlivet area. | ||
|Monitoring surveys and results=Topographical survey, geomorphological assessment,fluvial audit carried out in 2018 (cbec); Hydromorphological survey in 2019 (EnviroCentre). Post-restoration monitoring surveys to be carried out in 2021 by Spey Fishery Board. | |||
|Lessons learn=Cash flow was an issue as sizable sums required up front – project partner supported cash flow but the project could have been wider-reaching without this problem. | |||
Significant up-front investment is required to carry out initial survey work required to be able to inform land owners / managers about risks involved and allow them to decide if this is something they can accommodate. | |||
Lack of understanding about green engineering techniques means significant engagement is required early on to gain buy-in & permissions. | |||
Scottish Rural Development Programme's Agri-Environment Climate Scheme (AECS) can be a good source of funding to deliver river restoration projects, but involves upfront payments which can subsequently be reclaimed. | |||
Sourcing the tree trunks (250 in total) from a near-by plantation considerably reduced costs. | |||
|Project title=River Avon Our Water Environment | |Project title=River Avon Our Water Environment | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=19 08 06 Protected Species Survey Fordmouth and Delnabo Pic 34.jpg | |||
|Caption=One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA) | |||
}} | |||
{{Case study image | |||
|File name=Fig3 before revet.jpg | |||
|Caption=One of the log revetment sites before intervention showing bank erosion (note former fenceline between person & bankside trees). K.McDougall-EnviroCentre | |||
}} | |||
{{Case study image | |||
|File name=20190815 151130.jpg | |||
|Caption=Delivery of one load of tree trunks (250 trees used in total) K.McDougall-EnviroCentre | |||
}} | |||
{{Case study image | |||
|File name=19 09 03 Fordmouth ECOW 6.JPG | |||
|Caption=Tree trunks laid perpendicular to drainage ditch and main river channel | |||
}} | |||
{{Case study image | |||
|File name=20190904 101057.jpg | |||
|Caption=Installation of tree trunks with root plates aligned along bank toe line. Note excavated bank material piled to left & rocks being used to infill between logs). K.McDougall - EnviroCentre | |||
}} | |||
{{Case study image | |||
|File name=19 09 02 Fordmouth ECOW 2.JPG | |||
|Caption=Close-up of root balls which will form new bank | |||
}} | |||
{{Case study image | |||
|File name=P1040005.JPG | |||
|Caption=Fixings for log revetment (P.Lawson - Spey Catchment Initiative) | |||
}} | |||
{{Case study image | |||
|File name=20190904 101536.jpg | |||
|Caption=Tree trunks in 2 tiers seperated by logs at 90 degrees (K.McDougall - EnviroCentre) | |||
}} | |||
{{Case study image | |||
|File name=19 09 10-uppersection.jpg | |||
|Caption=River bank being reinstated by burying log revetment | |||
}} | |||
{{Case study image | |||
|File name=19 09 17-uppersection.jpg | |||
|Caption=Reinstated ground over log revetment (W.Boyd-Wallis-CNPA) | |||
}} | |||
{{Case study image | |||
|File name=FordmouthPlanting&LogRevetMar20.jpg | |||
|Caption=Riparian planting on reinstated ground above log revetment, showing root plates visible along river edge (J.Milner-TGLP) | |||
}} | |||
{{Case study image | |||
|File name=Fig6 revt&planting.jpg | |||
|Caption=Riparian vegetation development one year after project completion. Note theroot plates of the log revetment just visible along the water edge (J.Milner-TGLP) | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 26: | Line 85: | ||
|Subcatchment=River Spey | |Subcatchment=River Spey | ||
}} | }} | ||
{{Site}} | {{Site | ||
{{Project background}} | |Name=Fordmouth Farm, Tomintoul | ||
{{Motivations}} | |WFD water body name=River Avon | ||
{{Measures}} | |Pre-project morphology=Wandering | ||
|Heavily modified water body=No | |||
|Site designation=EU - Special Area of Conservation | |||
|Local site designation=Cairngorms National Park | |||
|Protected species present=Yes | |||
|Invasive species present=No | |||
|Species=Atlantic salmon, European Otter, Sea lamprey, Freshwater pearl mussel (Margaritifera margaritifera), | |||
|Dominant substrate=Cobble | |||
|River corridor land use=Improved/semi-improved grassland/pasture, | |||
|Average channel gradient category=0.001 - 0.01 | |||
|Avrg unit stream power=198 | |||
}} | |||
{{Project background | |||
|Reach length directly affected=180 | |||
|Project started=2015 | |||
|Total cost category=50 - 100 k€ | |||
|Funding sources=Scottish Rural Development Programme, National Lottery Heritage Fund | |||
|Investigation and design Lead organisation=CBec Eco Engineering | |||
|Investigation and design Other contact forename=Hamish | |||
|Investigation and design Other contact surname=Moir | |||
|Stakeholder engagement Lead organisation=Tomintoul & Glenlivet Landscape Partnership | |||
|Works and supervision Lead organisation=EnviroCentre | |||
|Works and supervision Other contact forename=Kenneth | |||
|Works and supervision Other contact surname=MacDougall | |||
|Post-project management and maintenance Lead organisation=Spey Fishery Board | |||
|Post-project management and maintenance Other contact forename=Duncan | |||
|Post-project management and maintenance Other contact surname=Ferguson | |||
|Monitoring Lead organisation=Spey Fishery Board | |||
|Supplementary funding information=EnviroCentre undertook survey, design and construction support for the installation of green engineering features, based on options appraisal and initial design phase of work carried out by cbec. | |||
Contractor who carried out works: FM Land Ltd, Cromdale, Grantown-on-Spey | |||
}} | |||
{{Motivations | |||
|Other motivation=Improve resilience to high flow events; reduce bank erosion & sedimentation; improve habitats | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Bank stabilisation using engineered wood structures; sediment management | |||
|Other technical measure=Set-back fencing & riparian planting | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 43: | Line 139: | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.therrc.co.uk/blog/our-water-environment-restoration-river-avon-catchment-cairngorms-national-park | |||
|Description=Guest blog - Our Water Environment green engineering projects | |||
}} | |||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | {{Toggle content end}} |
Latest revision as of 14:25, 21 June 2021
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Social benefits, Water quality |
Country | Scotland |
Main contact forename | Jos |
Main contact surname | Milner |
Main contact user ID | |
Contact organisation | Tomintoul & Glenlivet Landscape Partnership |
Contact organisation web site | http://www.tomintoulandglenlivet.com/our-water-environment/ |
Partner organisations | Spey Fishery Board, Cairngorms National Park Authority, Crown Estate Scotland, Delnabo Estate, Fordmouth Farm |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
River restoration works have been carried out along a high-energy reach of the River Avon within the River Spey Special Area of Conservation (SAC) in Cairngorms National Park. The project encompasses green engineering woody structures and sediment management, as well as water margin management and riparian planting. The aim is to improve the capability of the watercourse to cope with high flow events, reduce excessive erosion and to protect in-channel and riparian habitats, as well as farm livelihoods and infrastructure. The works were carried out as a Scottish Rural Development Programme (SRDP) Agri-Environment Climate Scheme (AECS), supported and managed by a National Lottery Heritage Funded partnership (Tomintoul & Glenlivet Landscape Partnership) as part of their wider ‘Our Water Environment’ project running across the Tomintoul and Glenlivet area.
Monitoring surveys and results
Topographical survey, geomorphological assessment,fluvial audit carried out in 2018 (cbec); Hydromorphological survey in 2019 (EnviroCentre). Post-restoration monitoring surveys to be carried out in 2021 by Spey Fishery Board.
Lessons learnt
Cash flow was an issue as sizable sums required up front – project partner supported cash flow but the project could have been wider-reaching without this problem.
Significant up-front investment is required to carry out initial survey work required to be able to inform land owners / managers about risks involved and allow them to decide if this is something they can accommodate.
Lack of understanding about green engineering techniques means significant engagement is required early on to gain buy-in & permissions.
Scottish Rural Development Programme's Agri-Environment Climate Scheme (AECS) can be a good source of funding to deliver river restoration projects, but involves upfront payments which can subsequently be reclaimed.
Sourcing the tree trunks (250 in total) from a near-by plantation considerably reduced costs.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Allt Lorgy River Restoration
Site
Project background
Cost for project phases
Supplementary funding informationEnviroCentre undertook survey, design and construction support for the installation of green engineering features, based on options appraisal and initial design phase of work carried out by cbec. Contractor who carried out works: FM Land Ltd, Cromdale, Grantown-on-Spey
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|