Case study:River Avon Our Water Environment: Difference between revisions
No edit summary |
No edit summary |
||
Line 31: | Line 31: | ||
{{Case study image | {{Case study image | ||
|File name=19 08 06 Protected Species Survey Fordmouth and Delnabo Pic 34.jpg | |File name=19 08 06 Protected Species Survey Fordmouth and Delnabo Pic 34.jpg | ||
|Caption=One of two areas of sediment to be removed to re-open a secondary channel | |Caption=One of two areas of sediment to be removed to re-open a secondary channel (W.Boyd-Wallis-CNPA) | ||
}} | |||
{{Case study image | |||
|File name=Fig3 before revet.jpg | |||
|Caption=One of the log revetment sites before intervention showing bank erosion (note former fenceline between person & bankside trees). K.McDougall-EnviroCentre | |||
}} | |||
{{Case study image | |||
|File name=20190815 151130.jpg | |||
|Caption=Delivery of one load of tree trunks (250 trees used in total) K.McDougall-EnviroCentre | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
Line 43: | Line 51: | ||
{{Case study image | {{Case study image | ||
|File name=P1040005.JPG | |File name=P1040005.JPG | ||
|Caption=Fixings for log revetment | |Caption=Fixings for log revetment (P.Lawson - Spey Catchment Initiative) | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
Line 51: | Line 59: | ||
{{Case study image | {{Case study image | ||
|File name=19 09 17-uppersection.jpg | |File name=19 09 17-uppersection.jpg | ||
|Caption=Reinstated ground over log revetment | |Caption=Reinstated ground over log revetment (W.Boyd-Wallis-CNPA) | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=FordmouthPlanting&LogRevetMar20.jpg | |File name=FordmouthPlanting&LogRevetMar20.jpg | ||
|Caption=Riparian planting on reinstated ground above log revetment, showing root plates visible along river edge | |Caption=Riparian planting on reinstated ground above log revetment, showing root plates visible along river edge (J.Milner-TGLP) | ||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=20190904 101057.jpg | |File name=20190904 101057.jpg | ||
|Caption=Installation of tree trunks with root plates aligned along bank toe line. Note excavated bank material piled to left & rocks being used to infill between logs). K.McDougall - EnviroCentre | |||
}} | }} | ||
{{Case study image | {{Case study image | ||
|File name=20190904 101536.jpg | |File name=20190904 101536.jpg | ||
|Caption=Tree trunks in 2 tiers seperated by logs at 90 degrees (K.McDougall - EnviroCentre) | |||
| | |||
}} | }} | ||
{{Image gallery end}} | {{Image gallery end}} |
Revision as of 12:53, 17 December 2020
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Social benefits, Water quality |
Country | Scotland |
Main contact forename | Jos |
Main contact surname | Milner |
Main contact user ID | |
Contact organisation | Tomintoul & Glenlivet Landscape Partnership |
Contact organisation web site | http://www.tomintoulandglenlivet.com/our-water-environment/ |
Partner organisations | Spey Fishery Board, Cairngorms National Park Authority, Crown Estate Scotland, Delnabo Estate, Fordmouth Farm |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
River restoration works have been carried out along a high-energy reach of the River Avon within the River Spey Special Area of Conservation (SAC) in Cairngorms National Park. The project encompasses green engineering woody structures and sediment management, as well as water margin management and riparian planting. The aim is to improve the capability of the watercourse to cope with high flow events, reduce excessive erosion and to protect in-channel and riparian habitats, as well as farm livelihoods and infrastructure. The works were carried out as a Scottish Rural Development Programme (SRDP) Agri-Environment Climate Scheme (AECS), supported and managed by a National Lottery Heritage Funded partnership (Tomintoul & Glenlivet Landscape Partnership) as part of their wider ‘Our Water Environment’ project running across the Tomintoul and Glenlivet area.
Monitoring surveys and results
Topographical survey, geomorphological assessment,fluvial audit carried out in 2018 (cbec); Hydromorphological survey in 2019 (EnviroCentre). Post-restoration monitoring surveys to be carried out in 2021 by Spey Fishery Board.
Lessons learnt
Cash flow was an issue as sizable sums required up front – project partner supported cash flow but the project could have been wider-reaching without this problem.
Significant up-front investment is required to carry out initial survey work required to be able to inform land owners / managers about risks involved and allow them to decide if this is something they can accommodate.
Lack of understanding about green engineering techniques means significant engagement is required early on to gain buy-in & permissions.
Scottish Rural Development Programme's Agri-Environment Climate Scheme (AECS) can be a good source of funding to deliver river restoration projects, but involves upfront payments which can subsequently be reclaimed.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Allt Lorgy River Restoration
Site
Project background
Cost for project phases
Supplementary funding informationEnviroCentre undertook survey, design and construction support for the installation of green engineering features, based on options appraisal and initial design phase of work carried out by cbec. Contractor who carried out works: FM Land Ltd, Cromdale, Grantown-on-Spey
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|