Case study:Habitat measures in Strynevassdraget: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=61.915766704267696, 6.763917163725864 }} {{Project overview |Project title=Habitat measures in Strynevassdra...")
 
No edit summary
 
(28 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Habitat measures in Strynevassdraget
|Status=Complete
|Status=Complete
|Themes=Habitat and biodiversity, Hydropower, Hydromorphology
|Themes=Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Monitoring
|Country=Norway
|Country=Norway
|Main contact forename=Anders Jarle
|Main contact forename=Anders Jarle
Line 14: Line 13:
|Contact organisation=The Norwegian Water Resources and Energy Directorate (NVE)
|Contact organisation=The Norwegian Water Resources and Energy Directorate (NVE)
|Contact organisation url=www.nve.no
|Contact organisation url=www.nve.no
|Partner organisations=Stryn municipality, Stryn elveeigarlag, County Governor of Vestland, Vestland County Council, The Norwegian Public Roads Administration, The Norwegian Coastal Administration, Norwegian Food Safety Authority, Utmarksressurs AS
|Multi-site=No
|Multi-site=No
|Project picture=Strynevassdraget oxbow lake reconnection.png
|Picture description=Reconnection of an oxbow lake under a gravel road along the Strynevassdraget. Source: Ole Dag Auflem
|Project summary=The measures carried out were based on a management plan for the River Basin District Vestlandet (period: 2010-2015) and initiated through the proposal "Heilskapeleg tiltaksplan for Strynevassdraget" prepared by Utmarksressurs AS. The management plan was drawn up to improve the water quality in the watercourse according to requirements in the Water Management Regulations (Vannfirskriften). The environmental objectives for Strynevassdraget were to improve the ecological condition in the main river, which was considered deficient.
A project lead by NVE (Norwegian Water Resources and Energy Directorate), in collaboration with Stryn Elveeigarlag and Stryn municipality, was started in 2016, when the highest priority measures were implemented. NVE finalized these measures in the fall of 2017. The measures were aimed at increasing the ecological value of the Strynevassdraget as a waterbody, by opening old streams and ox-bow lakes, creating shelters and habitats for fish, insects and ducks, in both the riverbed and along the cultivated land by the riverbanks.
The measures included:
• Opening of old streams and ox-bow lakes
• Habitat improvement measures
• Removal of migration berries for fish
|Monitoring surveys and results=Awaiting upcoming report with survey results.
|Project title=Habitat measures in Strynevassdraget
}}
}}
{{Image gallery}}
{{Image gallery}}
Line 21: Line 36:
{{Toggle content start}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site
{{Project background}}
|Name=Stryneelva
{{Motivations}}
|WFD water body code=088-29-R and 088-13-R
{{Measures}}
|WFD (national) typology=RWL2241 and RWL2811
|WFD water body name=Stryneelva and Sideelver til Stryneelva
|Heavily modified water body=No
|Local site designation=National Salmon Watercourse
|Protected species present=Yes
|Invasive species present=No
|Species=Salmon and Sea-trout
|River corridor land use=Intensive agriculture (arable), Urban,
}}
{{Project background
|Project started=2010/01/01
|Project completed=2018/01/01
|Total1 cost=119
|Funding sources=The Norwegian Water Resources and Energy Directorate (NVE), Stryn municipality, Stryn elveeigarlag
}}
{{Motivations
|Specific mitigation=Barriers to fish migration, Land drainage, Riparian development, Flood risk management,
|Biological quality elements=Invertebrates,
}}
{{Measures
|Bank and bed modifications measure=habitat improvements, Reopening of side channels, Removal of fish barriers,
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}
{{Biological quality elements header}}
{{Biological quality elements header}}
{{Biological quality element table row
|Element=Fish
|Monitored before=Yes
|Monitored after=Yes
|Qualitative monitoring=No
|Quantitative monitoring=No
|Control site used=No
|Result=Awaiting results
}}
{{Biological quality element table row
|Element=Invertebrates
|Monitored before=Yes
|Monitored after=No
|Qualitative monitoring=No
|Quantitative monitoring=No
|Control site used=No
}}
{{End table}}
{{End table}}
{{Physico-chemical quality elements header}}
{{Physico-chemical quality elements header}}
Line 38: Line 91:
{{Additional Documents end}}
{{Additional Documents end}}
{{Additional links and references header}}
{{Additional links and references header}}
{{Additional links and references
|Link=www.vannportalen.no/globalassets/vannregioner/rogaland/rogaland---dokumenter/publikasjoner/rapporter/heilskapleg-tiltaksplan-for-strynevassdraget.pdf
|Description=Measures plan
}}
{{Additional links and references
|Link=www.facebook.com/stryn.kommune/videos/strynevassdraget-er-blitt-rikare-p%C3%A5-b%C3%A5de-fugl-og-fisk/1237244539731489/
|Description=Video
}}
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}
{{Toggle content end}}

Latest revision as of 18:25, 9 September 2020

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 61° 54' 56.76" N, 6° 45' 50.10" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Monitoring
Country Norway
Main contact forename Anders Jarle
Main contact surname Muldsvor
Main contact user ID
Contact organisation The Norwegian Water Resources and Energy Directorate (NVE)
Contact organisation web site http://www.nve.no
Partner organisations Stryn municipality, Stryn elveeigarlag, County Governor of Vestland, Vestland County Council, The Norwegian Public Roads Administration, The Norwegian Coastal Administration, Norwegian Food Safety Authority, Utmarksressurs AS
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Reconnection of an oxbow lake under a gravel road along the Strynevassdraget. Source: Ole Dag Auflem

Project summary

Edit project overview to modify the project summary.


The measures carried out were based on a management plan for the River Basin District Vestlandet (period: 2010-2015) and initiated through the proposal "Heilskapeleg tiltaksplan for Strynevassdraget" prepared by Utmarksressurs AS. The management plan was drawn up to improve the water quality in the watercourse according to requirements in the Water Management Regulations (Vannfirskriften). The environmental objectives for Strynevassdraget were to improve the ecological condition in the main river, which was considered deficient.

A project lead by NVE (Norwegian Water Resources and Energy Directorate), in collaboration with Stryn Elveeigarlag and Stryn municipality, was started in 2016, when the highest priority measures were implemented. NVE finalized these measures in the fall of 2017. The measures were aimed at increasing the ecological value of the Strynevassdraget as a waterbody, by opening old streams and ox-bow lakes, creating shelters and habitats for fish, insects and ducks, in both the riverbed and along the cultivated land by the riverbanks.

The measures included:

• Opening of old streams and ox-bow lakes

• Habitat improvement measures

• Removal of migration berries for fish

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


Awaiting upcoming report with survey results.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Stryneelva
WFD water body codes 088-29-R and 088-13-R
WFD (national) typology RWL2241 and RWL2811
WFD water body name Stryneelva and Sideelver til Stryneelva
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations National Salmon Watercourse
Protected species present Yes
Invasive species present No
Species of interest Salmon and Sea-trout
Dominant hydrology
Dominant substrate
River corridor land use Intensive agriculture (arable), Urban
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010/01/01
Works started
Works completed
Project completed 2018/01/01
Total cost category
Total cost (k€) 119119 k€ <br />119,000 € <br />
Benefit to cost ratio
Funding sources The Norwegian Water Resources and Energy Directorate (NVE), Stryn municipality, Stryn elveeigarlag

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration, Land drainage, Riparian development, Flood risk management
Hydromorphology
Biology Invertebrates
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications habitat improvements, Reopening of side channels, Removal of fish barriers
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish Yes Yes No No No Awaiting results
Invertebrates Yes No No No No

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.vannportalen.no/globalassets/vannregioner/rogaland/rogaland---dokumenter/publikasjoner/rapporter/heilskapleg-tiltaksplan-for-strynevassdraget.pdf Measures plan
http://www.facebook.com/stryn.kommune/videos/strynevassdraget-er-blitt-rikare-p%C3%A5-b%C3%A5de-fugl-og-fisk/1237244539731489/ Video

Supplementary Information

Edit Supplementary Information