Case study:Habitat measures Hollundbekken: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 48: Line 48:
|Biological quality elements=reduced number of fish
|Biological quality elements=reduced number of fish
}}
}}
{{Measures}}
{{Measures
|Bank and bed modifications measure=introduction of spawning substrate and larger stones in the creek
|Social measures=project coonducted in coopperation with the local hunting and fishing association
}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}
{{End table}}
{{End table}}

Revision as of 13:07, 6 December 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 59° 28' 44.40" N, 5° 6' 36.00" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Fisheries, Habitat and biodiversity, Hydromorphology
Country Norway
Main contact forename Marius
Main contact surname Kambestad
Main contact user ID
Contact organisation Bømlo municipality, Rådgivende Biologer AS
Contact organisation web site http://https://www.radgivende-biologer.no
Partner organisations Bømlo hunting and fishing association
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Bømlo municipality has impacted Hollund creek in the past and initiated this project to improve the habitat conditions for fish by re-establishing spawning areas for trout. This is done in cooperation with the Bømlo hunting and fishing association. Concrete restoration measures are:

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


This project is still in progress. A success evaluation is planned (

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes 043-22224-L
WFD (national) typology
WFD water body name Storavatnet
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 01.09.2017
Works started
Works completed
Project completed 2020/12/31
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Bømlo municipality

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Bømlo municipality
Stakeholder engagement and communication Bømlo municipality
Works and works supervision Bømlo municipality
Post-project management and maintenance Bømlo municipality
Monitoring Rådgivende Biologer AS Marius Kambestad



Reasons for river restoration

Mitigation of a pressure culverting of the creek, sedimentation (with fine sediments)
Hydromorphology reduced connectivity (reduced migration possibilities) and morphological conditions
Biology reduced number of fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications introduction of spawning substrate and larger stones in the creek
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) project coonducted in coopperation with the local hunting and fishing association
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information