Case study:Bird reserve “El Clot” (Tarragona): Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 46: Line 46:
|Dominant substrate=cast
|Dominant substrate=cast
}}
}}
{{Project background}}
{{Project background
|Reach length directly affected=400
|Project started=1998/01/01
}}
{{Motivations}}
{{Motivations}}
{{Measures}}
{{Measures}}

Revision as of 10:04, 22 October 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 40° 41' 1.37" N, 0° 42' 12.57" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.seo.org/reservas-ornitologicas/
Themes Environmental flows and water resources, Habitat and biodiversity, Land use management - agriculture, Social benefits, Spatial planning
Country Spain
Main contact forename Cristina
Main contact surname Sánchez
Main contact user ID User:SEO BirdLife
Contact organisation SEO BirdLife
Contact organisation web site http://www.seo.org
Partner organisations SEO/BirdLife, farmers association
This is a parent project
encompassing the following
projects
Project picture

Project summary

Edit project overview to modify the project summary.


The objectives of the proyect: 1) Recovery of natural habitats and biodiversity in a highly intensified landscape; and 2) Stablish sustainable agricultural practiques

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


First, farmers began to cultivate ecologic rice and decrease the use of chemical components. Some rice paddies were converted into wetlands with the introduction of Phragmites australis and other techniques works. Furthermore, Iris pseudacorus were installed in the shore of wetlands. So much vegetation recovered and new natural spaces were created.

Lessons learnt

Edit project overview to modify the lessons learnt.


The function of aquatic birds and local vegetation in this environment is very important, they stablish a ecological balance and they can provide a beautiful place to visit. Furthermore, the installation of ecological rice has improved the enviromental flows.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district cuenca del ebro
River basin cuenca del ebro

Subcatchment

River name ebro
Area category
Area (km2) 0.060.06 km² <br />6 ha <br />
Maximum altitude category
Maximum altitude (m) 0.40.4 m <br />4.0e-4 km <br />40 cm <br />
Dominant geology Continental crast
Ecoregion Northeast Spain and Southern France Mediterranean forests"Northeast Spain and Southern France Mediterranean forests" is not in the list (Iceland, Tundra, Borealic uplands, Fenno-Scandian Shield, Great Britain, Ireland and Northern Ireland, Ibero-Macaronesian, Taiga, Central Plains, Baltic Province, ...) of allowed values for the "Ecoregion" property.
Dominant land cover Rice paddies, freshwater lagoon and salty lagoons
Waterbody ID



Other case studies in this subcatchment: Bird reserve “Riet Vell” (Tarragona), INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON)


Site

Name El Clot
WFD water body codes
WFD (national) typology Coastal waters
WFD water body name Lowland, calcareous or mixed, very small-small
Pre-project morphology Rice paddies and wetlands
Reference morphology Rice paddies and wetlands
Desired post project morphology
Heavily modified water body No
National/international site designation EU - Special Protected Area
Local/regional site designations Special Protection Zones for Birds (SPA)
Protected species present Yes
Invasive species present No
Species of interest Emberiza schoeniclus witherbyi, Plegadis falcinellus, Emberiza schoeniclus witherbyi, Iris pseudacorus, Ixobrychus minutus
Dominant hydrology Freshwater and brackish lagoons
Dominant substrate cast
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 400400 m <br />0.4 km <br />40,000 cm <br />
Project started 1998/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information