Case study:Lugton Water Fish Barrier Easement: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Lugton Water Fish Barrier Easement
|Status=Complete
|Status=Complete
|Themes=Fisheries, Habitat and biodiversity
|Themes=Fisheries, Habitat and biodiversity
Line 14: Line 13:
|Contact organisation=Ayrshire Rivers Trust
|Contact organisation=Ayrshire Rivers Trust
|Contact organisation url=www.ayrshireriverstrust.org
|Contact organisation url=www.ayrshireriverstrust.org
|Partner organisations=SEPA,
|Multi-site=No
|Multi-site=No
|Project title=Lugton Water Fish Barrier Easement
}}
}}
{{Image gallery}}
{{Image gallery}}
Line 30: Line 31:
}}
}}
{{Project background
{{Project background
|Reach length directly affected=3000
|Project started=01/02/2015
|Project started=01/02/2015
|Total cost category=100 - 500 k€
|Total cost category=100 - 500 k€
Line 38: Line 38:
|Monitoring Lead organisation=Ayrshire Rivers Trust
|Monitoring Lead organisation=Ayrshire Rivers Trust
}}
}}
{{Motivations}}
{{Motivations
|Specific mitigation=Impoundments (not hydropower), Barriers to fish migration,
|Biological quality elements=Fish: Abundance,
}}
{{Measures
{{Measures
|Bank and bed modifications measure=Weir modification,
|Bank and bed modifications measure=Weir modification,

Latest revision as of 10:51, 11 April 2019

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 55° 39' 49.54" N, 4° 38' 57.23" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity
Country Scotland
Main contact forename Muir
Main contact surname Glendinning
Main contact user ID
Contact organisation Ayrshire Rivers Trust
Contact organisation web site http://www.ayrshireriverstrust.org
Partner organisations SEPA
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Sevenacres
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest Atlantic salmon (Salmo salar), Sea trout (Salmo trutta), Brown trout (Salmo trutta)
Dominant hydrology
Dominant substrate
River corridor land use Improved/semi-improved grassland/pasture, Broadleaf/mixed plantation
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 01/02/2015
Works started
Works completed
Project completed
Total cost category 100 - 500 k€
Total cost (k€)
Benefit to cost ratio
Funding sources Scottish Water Environment Fund (WEF)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Royal HaskoningDHV
Stakeholder engagement and communication
Works and works supervision Royal HaskoningDHV
Post-project management and maintenance
Monitoring Ayrshire Rivers Trust



Reasons for river restoration

Mitigation of a pressure Impoundments (not hydropower), Barriers to fish migration
Hydromorphology
Biology Fish: Abundance
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Weir modification
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information