Case study:Reopening of the culverted Redon river: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=46.337915, 6.432465999999977 }} {{Project overview |Project title=Reopening of the culverted Redon river |St...") |
No edit summary |
||
(14 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Habitat and biodiversity | |Themes=Environmental flows and water resources, Habitat and biodiversity | ||
Line 14: | Line 13: | ||
|Contact organisation=Symasol | |Contact organisation=Symasol | ||
|Contact organisation url=www.symasol.fr/ | |Contact organisation url=www.symasol.fr/ | ||
|Partner organisations=Symasol, departmental environmental and agriculture division, the French National Agency for Water and Aquatic Environments (Office National de L’Eau et des Milieux Aquatiques), Fédération départementale de la pêche (departmental fishing federation), local fishing association, the commune. | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Quarry after restoration.png | |||
|Picture description=Reopening of 230 metres of the Redon. Overview of the site after restoration work -2009 (River next to parking lot) (Symasol). | |||
|Project summary=1.5 km from its outlet, the | |||
Redon had been culverted for the purposes of a quarry. | |||
The passage of the river through a concrete culvert | |||
covering a 230 metre stretch prevents many of the fish | |||
from the lake from swimming upstream, to an ideal | |||
breeding ground. The quarry where the culvert is located is no | |||
longer active, therefore 230 metres of the culverted river were reopened. In | |||
order to diversify the environment, a meandering | |||
bed was created. Plantation was used to protect the | |||
banks and the longitudinal section was stabilised | |||
|Monitoring surveys and results=Pre-restoration works monitoring have been carried | |||
out. It includes a topographic survey for a hydraulic | |||
analysis of the site. Furthermore, fish rescue by electric | |||
fishing was performed at the opening of the culvert. | |||
Fish stocks were monitored following the culvert | |||
removal on the Redon, six months after the restoration | |||
work. As part of the appraisal of the “Crossborder | |||
river contractforthe southwest part of Lake Geneva” | |||
(2006-2012), fish stocks were monitored in all the | |||
watercourses in the area covered by the SYMASOL. | |||
For this, the fish population was counted in the | |||
Redon at the location of the work site in the summer | |||
of 2011, four years after the restoration work. | |||
An IBGN survey was conducted in 2009 (two years | |||
after the work) by a consultancy. | |||
Lake trout can now swim up the whole length of | |||
the Redon. | |||
Six months after the works, about 230 river trout | |||
were recorded throughout the reopened stretch, | |||
i.e. 3,800 individuals per hectare against only | |||
fifteen or so individuals identified during the fish | |||
rescue operation. | |||
The results of the 2011 electric fishing confirm the | |||
trend noted six months after work was completed. | |||
Thus, 48 trout were counted on the upstream | |||
station, i.e. 3,678 individuals per hectare. | |||
These results are very positive and seem to indicate | |||
that the fish population is stabilising in the part of the | |||
watercourse where the culvert has been removed. | |||
The IBGN analysis suggests that the quality of water | |||
is restrictive in this portion of the Redon. The taxon | |||
indicator (Hydropsychidae) is relatively tolerant to | |||
poor water quality and taxonomic diversity is quite | |||
low (18 taxons identified). However, the absence of | |||
a sampling point before the restoration work does | |||
not allow the observation of a potential gain in | |||
terms of water quality or habitat diversity due to | |||
removal of the culvert. | |||
The outcome in terms of overall assessment is | |||
excellent from the point of view of elected officials, | |||
residents and fishing stakeholders. | |||
Pursuant to the River Contract (2006-2012), a | |||
general policy to review weirs preventing river | |||
continuity was implemented. Rocky boulders or | |||
bypasses were set up to make weirs passable. | |||
|Project title=Reopening of the culverted Redon river | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=Quarry without restoration.png | |||
|Caption=Overview of the quarry before restoration work - 2007 (Symasol) | |||
}} | |||
{{Case study image | |||
|File name=Buried river.png | |||
|Caption=The Redon buried in the downstream section. Before restoration work -2007 (Symasol) | |||
}} | |||
{{Case study image | |||
|File name=After 2 years.png | |||
|Caption=The Redon in the downstream section, 2 years after restoration work - 2009 (Symasol) | |||
}} | |||
{{Case study image | |||
|File name=Redon after restoration.png | |||
|Caption=The Redon after the reopening and development of the low water channel - 2009 (Symasol) | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
{{Project background}} | |WFD water body code=FRDR11140 | ||
{{Motivations}} | |Heavily modified water body=No | ||
{{Measures}} | |Protected species present=Yes | ||
|Invasive species present=No | |||
|Species=river trout, lake trout | |||
|Average bankfull channel width category=2 - 5 m | |||
|Avrg bankfull channel width=3 | |||
|Mean discharge category=0.1 - 1.0 m³/s | |||
|Mn discharge=0.5 | |||
}} | |||
{{Project background | |||
|Reach length directly affected=230 | |||
|Project started=2006/09/01 | |||
|Project completed=2007/01/01 | |||
|Total cost category=100 - 500 k€ | |||
|Total1 cost=145 | |||
|Funding sources=Agence de l’eau (Water Agency) (31%), General Council (28%), Regional Council (10%), Symasol (31%). | |||
}} | |||
{{Motivations | |||
|Hydromorphological quality elements=Continuity for organisms, | |||
|Biological quality elements=Fish: Abundance, | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Reopening of culverted river, Bank stabilisation, Planting, | |||
|Planform / Channel pattern=Meandering channel, | |||
}} | |||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 38: | Line 144: | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.onema.fr/sites/default/files/EN/EV/publication/rex_RedonGB.pdf | |||
|Description=All information on this page is copied from the AFB, The French Agency for biodiversity | |||
}} | |||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | {{Toggle content end}} |
Latest revision as of 16:41, 2 January 2019
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity |
Country | France |
Main contact forename | Maxime |
Main contact surname | Chateauvieux |
Main contact user ID | |
Contact organisation | Symasol |
Contact organisation web site | http://www.symasol.fr/ |
Partner organisations | Symasol, departmental environmental and agriculture division, the French National Agency for Water and Aquatic Environments (Office National de L’Eau et des Milieux Aquatiques), Fédération départementale de la pêche (departmental fishing federation), local fishing association, the commune. |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
1.5 km from its outlet, the
Redon had been culverted for the purposes of a quarry.
The passage of the river through a concrete culvert
covering a 230 metre stretch prevents many of the fish
from the lake from swimming upstream, to an ideal
breeding ground. The quarry where the culvert is located is no
longer active, therefore 230 metres of the culverted river were reopened. In
order to diversify the environment, a meandering
bed was created. Plantation was used to protect the
banks and the longitudinal section was stabilised
Monitoring surveys and results
Pre-restoration works monitoring have been carried
out. It includes a topographic survey for a hydraulic
analysis of the site. Furthermore, fish rescue by electric
fishing was performed at the opening of the culvert.
Fish stocks were monitored following the culvert removal on the Redon, six months after the restoration work. As part of the appraisal of the “Crossborder river contractforthe southwest part of Lake Geneva” (2006-2012), fish stocks were monitored in all the watercourses in the area covered by the SYMASOL. For this, the fish population was counted in the Redon at the location of the work site in the summer of 2011, four years after the restoration work.
An IBGN survey was conducted in 2009 (two years after the work) by a consultancy.
Lake trout can now swim up the whole length of the Redon.
Six months after the works, about 230 river trout were recorded throughout the reopened stretch, i.e. 3,800 individuals per hectare against only fifteen or so individuals identified during the fish rescue operation.
The results of the 2011 electric fishing confirm the trend noted six months after work was completed. Thus, 48 trout were counted on the upstream station, i.e. 3,678 individuals per hectare.
These results are very positive and seem to indicate that the fish population is stabilising in the part of the watercourse where the culvert has been removed.
The IBGN analysis suggests that the quality of water is restrictive in this portion of the Redon. The taxon indicator (Hydropsychidae) is relatively tolerant to poor water quality and taxonomic diversity is quite low (18 taxons identified). However, the absence of a sampling point before the restoration work does not allow the observation of a potential gain in terms of water quality or habitat diversity due to removal of the culvert.
The outcome in terms of overall assessment is excellent from the point of view of elected officials, residents and fishing stakeholders.
Pursuant to the River Contract (2006-2012), a general policy to review weirs preventing river continuity was implemented. Rocky boulders or bypasses were set up to make weirs passable.
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|