Case study:River Ebbw Bank Stabilisation: Difference between revisions
No edit summary |
No edit summary |
||
(12 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 7: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url=salixrw.com/project/river-ebbw-bank-stabilisation | |||
|Country=Wales | |Country=Wales | ||
|Main contact forename=David | |Main contact forename=David | ||
Line 14: | Line 15: | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Ebbw June 2006 003.jpg | |Project picture=Ebbw June 2006 003.jpg | ||
|Project summary=This project aimed to stabilise a highly erodible bank | |Picture description=Following restoration | ||
|Project summary=This project aimed to stabilise a highly erodible bank consisting mainly of colliery shale by using a green, visually appealing method. Rock rolls and live willow bundles (faggots) were placed to protect toes. The upper bank was protected using high performance erosion control mats and native willow cutting. Locally occurring riverside grasses and rushes were planted to revegetate the marginal areas. | |||
The River Restoration Centre would like to thank David Holland from Salix River & Wetland Services Limited for providing the information and photographs for this case study. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=River ebbw 001.jpg | |||
}} | |||
{{Case study image | |||
|File name=River ebbw 003.jpg | |||
}} | |||
{{Case study image | |||
|File name=River ebbw 005.jpg | |||
}} | |||
{{Case study image | |||
|File name=Greening new literature.JPG | |||
}} | |||
{{Case study image | |||
|File name=Ebbw June 2005 004.jpg | |||
}} | |||
{{Case study image | |||
|File name=Green new literature.JPG | |||
}} | |||
{{Case study image | |||
|File name=DSC05492.JPG | |||
}} | |||
{{Case study image | |||
|File name=DSC05497.JPG | |||
}} | |||
{{Case study image | |||
|File name=DSC05500.JPG | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Ebbw R - conf Ebbw Fach R to Maes-glas | |||
}} | }} | ||
{{Site | {{Site | ||
|Name=River Ebbw | |Name=River Ebbw | ||
Line 33: | Line 71: | ||
|Project started=2005/01/02 | |Project started=2005/01/02 | ||
|Project completed=2005/04/03 | |Project completed=2005/04/03 | ||
|Total cost category= | |Total cost category=10 - 50 k€ | ||
|Total1 cost= | |Total1 cost=15 | ||
|Funding sources=Merrimans Ltd | |Funding sources=Merrimans Ltd | ||
}} | }} | ||
{{Motivations}} | {{Motivations}} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bank | |Bank and bed modifications measure=Bank stabilisation, Bank protection, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 58: | Line 96: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 96: | Line 106: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 15:48, 2 January 2019
Project overview
Status | Complete |
---|---|
Project web site | http://salixrw.com/project/river-ebbw-bank-stabilisation |
Themes | |
Country | Wales |
Main contact forename | David |
Main contact surname | Holland |
Main contact user ID | |
Contact organisation | Salix River & Wetland Services Limited |
Contact organisation web site | http://www.salixrw.com |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project aimed to stabilise a highly erodible bank consisting mainly of colliery shale by using a green, visually appealing method. Rock rolls and live willow bundles (faggots) were placed to protect toes. The upper bank was protected using high performance erosion control mats and native willow cutting. Locally occurring riverside grasses and rushes were planted to revegetate the marginal areas.
The River Restoration Centre would like to thank David Holland from Salix River & Wetland Services Limited for providing the information and photographs for this case study.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|