Case study:Diversion of the River Nith: Difference between revisions
No edit summary |
No edit summary |
||
(9 intermediate revisions by 3 users not shown) | |||
Line 10: | Line 10: | ||
|Themes=Economic aspects, Habitat and biodiversity | |Themes=Economic aspects, Habitat and biodiversity | ||
|Country=Scotland | |Country=Scotland | ||
|Main contact forename= | |Main contact forename=Charles | ||
|Main contact surname= | |Main contact surname=Perfect | ||
|Contact organisation=Centre for River EcoSystem Science | |||
|Contact organisation=River | |Partner organisations=East Ayrshire Council, SEPA, Scottish Natural Heritage, RSPB, Nith Salmon Fisheries Board, New Cumnock Angling Association, Halcrow, River Restoration Centre | ||
|Partner organisations=East Ayrshire Council, SEPA, | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Nith Diversion.png | |Project picture=Nith Diversion.png | ||
Line 36: | Line 35: | ||
PHASE 2: During 2004, the former course was enhanced and reconnected to the rest of the river and the temporary channel cut off to allow mining to progress across the floodplain. The site was subject to significant post-restoration biological monitoring as part of a PhD programme through CRESS (Centre for River Ecosystem Science - University of Stirling) - to ensure the new channel was performing well, ecologically. | PHASE 2: During 2004, the former course was enhanced and reconnected to the rest of the river and the temporary channel cut off to allow mining to progress across the floodplain. The site was subject to significant post-restoration biological monitoring as part of a PhD programme through CRESS (Centre for River Ecosystem Science - University of Stirling) - to ensure the new channel was performing well, ecologically. | ||
2000: channel bed/ground layer consisted of existing substrate with clay lining. 2004: Geotextile reinforcement of banks, to reduce bank erosion. Clay mattress lining to prevent water percolating through unconsolidated substrate and flowing as groundwater through potentially contaminated mine tailings. Gravel added to bed to create habitat diversity for invertebrates and fish. 2000: Containment bund constructed to prevent flooding of mine workings. | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 84: | Line 86: | ||
|Works completed=2000/09/01 | |Works completed=2000/09/01 | ||
|Total cost category=more than 10000 k€ | |Total cost category=more than 10000 k€ | ||
|Total1 cost= | |Total1 cost=3900000 | ||
|Funding sources=Scottish Coal | |Funding sources=Scottish Coal | ||
|Investigation and design Lead organisation=Halcrow | |Investigation and design Lead organisation=Halcrow | ||
|Works and supervision Lead organisation=Morrison | |Works and supervision Lead organisation=Morrison | ||
|Monitoring Lead organisation=University of Stirling | |Monitoring Lead organisation=University of Stirling | ||
|Supplementary funding information=Phase 1: 3900000 (thousands of euros) | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 94: | Line 97: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Introduction of gravel, Habitat diversification, Bank stabilisation, Bank protection, | ||
|Floodplain / River corridor= | |Floodplain / River corridor=Containment bund to prevent flooding | ||
|Other technical measure=Addition of boulders to bed, | |Other technical measure=Addition of boulders to bed, Fish habitat restoration, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 154: | Line 157: | ||
}} | }} | ||
{{Additional links and references | {{Additional links and references | ||
|Link=www.therrc.co.uk/ | |Link=www.therrc.co.uk/MOT/Final_Versions_(Secure)/11.2_Nith.pdf | ||
|Description=RRC - Manual of Techniques | |Description=RRC - Manual of Techniques (2013 update) | ||
}} | }} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} | {{Toggle content end}} |
Latest revision as of 15:47, 2 January 2019
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Habitat and biodiversity |
Country | Scotland |
Main contact forename | Charles |
Main contact surname | Perfect |
Main contact user ID | |
Contact organisation | Centre for River EcoSystem Science |
Contact organisation web site | |
Partner organisations | East Ayrshire Council, SEPA, Scottish Natural Heritage, RSPB, Nith Salmon Fisheries Board, New Cumnock Angling Association, Halcrow, River Restoration Centre |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
PHASE 1: 2000 - Temporary diversion of the Nith to the north west of its current floodplain to allow for coal extraction by Scottish Coal.
The Nith is an important salmon and trout fishery, however overgrazing, agriculture and past open-cast mining along the reach have affected invertebrate populations and fish spawning grounds.
The primary restoration criteria for the 2000 restoration were:
- design which would convey a 1 in 50 year flood.
- channel which would not dry up during low flow.
- design mimicing pre-diversion channel - ie. similar meander loops, pool-riffle-run sequences and channel profiles.
- design which would create opportunities for enhancement of biodiversity (over and above pre-diversion conditions).
Work commenced in April 2000 and was completed during September of the same year.
PHASE 2: During 2004, the former course was enhanced and reconnected to the rest of the river and the temporary channel cut off to allow mining to progress across the floodplain. The site was subject to significant post-restoration biological monitoring as part of a PhD programme through CRESS (Centre for River Ecosystem Science - University of Stirling) - to ensure the new channel was performing well, ecologically.
2000: channel bed/ground layer consisted of existing substrate with clay lining. 2004: Geotextile reinforcement of banks, to reduce bank erosion. Clay mattress lining to prevent water percolating through unconsolidated substrate and flowing as groundwater through potentially contaminated mine tailings. Gravel added to bed to create habitat diversity for invertebrates and fish. 2000: Containment bund constructed to prevent flooding of mine workings.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Supplementary funding informationPhase 1: 3900000 (thousands of euros)
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|